My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-402
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 12:36:49 PM
Creation date
9/30/2015 11:28:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
11/20/2007
Control Number
2007-402
Agenda Item Number
11.J.1
Entity Name
Sheltra and Son Construction
Subject
Change Order No.2 West Wabasso Phase I
Water Lines
Area
West Wabasso
Project Number
UCP 2447
Supplemental fields
SmeadsoftID
6698
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Item # 11 Description : <br /> Deduct 20, 1 " PE Service from meter to home at a unit price of $650. 00 each <br /> (Total -$ 13 ,000 .00) <br /> Total ($ 13,000.00) <br /> Reason for change order: <br /> Plumber performed fifty-nine (59) home connections total; bid specifications included seventy- <br /> nine (79) home connections. Two (2) mobile homes connected did not require pressure tests . <br /> Item # 12 Description : <br /> Deduct 7 . 2 Interior Plumbing Repairs at a unit price of 10 at $ 1 ,000.00 each <br /> (Total -$7,200. 00) <br /> Total ($ 7,200.00) <br /> Reason for change order: <br /> Interior plumbing repairs addressed were based on pressure test results and onsite findings. <br /> Item # 13 Description : <br /> Add IRC Building Department Inspection Fee (Total $ 2, 196 . 50) <br /> Total $ 2, 196.50 <br /> Reason for change order: <br /> Contractor paid for 57 Building Department Inspection Fees. No inspection fees were included in <br /> bid specifications. <br /> Item # 14 Description : <br /> Add 95 days to construction completion date from April 27 2007 to date July 31 2007 <br /> Total $ -0- <br /> Reason for change order: <br /> Time delays due to difficulties encountered by plumber acquiring access to properties to perform <br /> testing, inspections and hookups . <br />
The URL can be used to link to this page
Your browser does not support the video tag.