Laserfiche WebLink
WORK CHANGE DIRECTIVE <br /> Oslo Road/ Lateral "J " Canal Bridge Replacement <br /> DIRECTIVE NO . 3 <br /> CONTRACTOR : Lucas Marine Construction , Inc . Attn : Wade E Diekman <br /> 3130 SE Slater Street <br /> StuartFlorida 34997 <br /> DATE OF ISSUANCE : <br /> Description of Change : <br /> Line stop for 20" WM . Price Increase : $ 18 , 265 . 00 <br /> Purpose of Work Change Directive : To install a line stop to tie in the 8" WM to the 20" WM that has <br /> been unable to be shut down . <br /> Attachments : None . <br /> If OWNER or CONTRACTOR believes that the above change has affected the Contract Price or Time, any Claim for a <br /> Change Order based thereon will involve one or more of the following methods as defined in the Contract Documents . <br /> Method of determining change in Method of determining change in <br /> Contract Prices: Contract Times <br /> IR Unit Prices [] Contractor's Records <br /> 0 Lump Sum f3 Engineers Records <br /> 0 Other: 0 Other:_ <br /> Estimated increase/decrease in Contract Price: Estimated increase (decrease) in Contract Times: <br /> $ 185265 . 00 0 Calendar Days <br /> ISSUED: ACKNOW EDGE . / <br /> By: By: <br /> OWNER/ENGINEER ( ut CONTRACTOR (Authorized Signature) <br /> Date: Date: 7 <br /> Distribution of Copies : <br /> Terry Rauth , P . E . , IRC Capital Projects Manager <br /> Erik Olson , P . E . , IRC Utilities Director <br /> Mike Hotchkiss , P . E . , IRC Utilities Capital Projects Manager <br /> Joe Loudermilk, IRC Utility Inspector <br /> Brian Good , P . E . , Kimley- Horn and Associates , Inc. <br /> David K. Lucas , President, Lucas Marine Construction , Inc. <br /> Chip Boyette , IRC Project Specialist <br /> Rick Mathis , IRC Senior Engineering Inspector <br /> Office File <br /> F:\Public Works\Capital Projects\Oslo Road Lateral J\Lucas Marine\Change Orders and Work Change Directives\Work Change 3.doc <br />