My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-126
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 3:59:16 PM
Creation date
9/30/2015 9:39:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/18/2006
Control Number
2006-126
Agenda Item Number
7.F.
Entity Name
Lucas Marine Construction
Subject
Change Order Nol. 3 for Oslo Road/Lateral "J"Canal Bridge
Supplemental fields
SmeadsoftID
5594
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK CHANGE DIRECTIVE <br /> Oslo Road/ Lateral "J " Canal Bridge Replacement <br /> DIRECTIVE NO . 3 <br /> CONTRACTOR : Lucas Marine Construction , Inc . Attn : Wade E Diekman <br /> 3130 SE Slater Street <br /> StuartFlorida 34997 <br /> DATE OF ISSUANCE : <br /> Description of Change : <br /> Line stop for 20" WM . Price Increase : $ 18 , 265 . 00 <br /> Purpose of Work Change Directive : To install a line stop to tie in the 8" WM to the 20" WM that has <br /> been unable to be shut down . <br /> Attachments : None . <br /> If OWNER or CONTRACTOR believes that the above change has affected the Contract Price or Time, any Claim for a <br /> Change Order based thereon will involve one or more of the following methods as defined in the Contract Documents . <br /> Method of determining change in Method of determining change in <br /> Contract Prices: Contract Times <br /> IR Unit Prices [] Contractor's Records <br /> 0 Lump Sum f3 Engineers Records <br /> 0 Other: 0 Other:_ <br /> Estimated increase/decrease in Contract Price: Estimated increase (decrease) in Contract Times: <br /> $ 185265 . 00 0 Calendar Days <br /> ISSUED: ACKNOW EDGE . / <br /> By: By: <br /> OWNER/ENGINEER ( ut CONTRACTOR (Authorized Signature) <br /> Date: Date: 7 <br /> Distribution of Copies : <br /> Terry Rauth , P . E . , IRC Capital Projects Manager <br /> Erik Olson , P . E . , IRC Utilities Director <br /> Mike Hotchkiss , P . E . , IRC Utilities Capital Projects Manager <br /> Joe Loudermilk, IRC Utility Inspector <br /> Brian Good , P . E . , Kimley- Horn and Associates , Inc. <br /> David K. Lucas , President, Lucas Marine Construction , Inc. <br /> Chip Boyette , IRC Project Specialist <br /> Rick Mathis , IRC Senior Engineering Inspector <br /> Office File <br /> F:\Public Works\Capital Projects\Oslo Road Lateral J\Lucas Marine\Change Orders and Work Change Directives\Work Change 3.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.