My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-126
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 3:59:16 PM
Creation date
9/30/2015 9:39:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/18/2006
Control Number
2006-126
Agenda Item Number
7.F.
Entity Name
Lucas Marine Construction
Subject
Change Order Nol. 3 for Oslo Road/Lateral "J"Canal Bridge
Supplemental fields
SmeadsoftID
5594
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L M C LUCAS MARINE CONSTRUCTION , LLC <br /> March 14, 2006 ED L9 CIE EE <br /> APR 0 3 2006 <br /> Indian River County Board of County Commissioners 1 � <br /> 1a4o2s� St. L. CAP I,4L 1WR ® JPr TS <br /> Vero Beach, FL 32960-3365 <br /> Attn: Janet B . Dunlap, P.E. <br /> RE : Oslo Road/Lateral "J" Canal Bridge Replacement <br /> Line Stop to Tie in 8" Line t-tD c?�ik y.1 K <br /> Ladies and Gentlemen: <br /> As requested, we are submitting the following for your consideration. As Indian River County <br /> Utilities has been unable to shut down the 20" watermain, we will provide all labor, materials <br /> and equipment necessary to install a line stop in order to tie in the 8" line. <br /> The total lump sum cost to complete this work is $ 18,265.00. <br /> If you have any questions or require additional information, please do not hesitate to contact us. <br /> Sincerely <br /> Wade Diekman <br /> Vice-President <br /> 3130 SE Slater St. 9 Stuart , FL 34997 • (772) 286-5094 • Fax (772) 286- 1139 <br />
The URL can be used to link to this page
Your browser does not support the video tag.