My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-303
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 4:33:55 PM
Creation date
9/30/2015 10:00:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
09/12/2006
Control Number
2006-303
Agenda Item Number
7.I.
Entity Name
Peter R. Brown Construction, Inc.
Subject
Indian River County Jail video visitation & visitor's center
Area
41st Avenue
Supplemental fields
SmeadsoftID
5807
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TPeter <br /> ERM <br /> KM0. BBGWYM [F WN. M <br /> Indian River County Sheriff's Office <br /> Video Visitation & Visitor's Center <br /> Revised GMP Proposal <br /> August 25, 2006 <br /> 16. Costs for concrete and masonry quality control services are not required or included. <br /> 17 . Applications for Payment will be submitted separately in accordance with AIA A121 CMc <br /> 2003 between Indian River County Board of County Commissioners and Peter R. Brown <br /> Construction, Inc. , or other method agreeable to Peter R. Brown Construction, Inc. and <br /> Indian River County Sheriff's Office. <br /> Scope Clarifications <br /> 02A Site Work and Site Demolition <br /> 02A-1 . Demolition, excavation, underground work, backfill and site restoration are not <br /> included for this project. It is assumed that all work is to be conducted inside the <br /> existing buildings. <br /> 02C Landscaping <br /> 02C-1 . Landscaping is not shown or included. <br /> 02D — Selective Demolition <br /> 02D-1 . Existing corridor walls will be core drilled for new conduits/raceways and patched <br /> to match existing surfaces and fire or sound ratings. <br /> 02D-2. Temporary barriers or partitions to separate inmates from construction workers <br /> are not included. <br /> 03A Concrete <br /> 03A-1 . Concrete encasements of new raceways are not included . <br /> 03B Structural Pre-cast Concrete <br /> 0313-1 . Hollow core or precast concrete panels are not included. <br /> 04A Masonry <br /> 04A- 1 . New masonry partitions or chases are not included . <br /> 05A Structural 8 Miscellaneous Steel <br /> 05A-1 . New structural or miscellaneous steel members are not included . <br /> 06A Cabinets <br /> 06A- 1 . Plastic laminate casework is to be installed as indicated in rooms H16 and H17 <br /> on Sheet A1 .2 dated 12/20/05. The costs for the casework were included in the <br /> Jail Expansion GMP dated 1 /30/06. <br /> 07A Roofing 8 Siding <br /> 07A- 1 . Roofing work is not included . <br /> 07B Detention Caulking, Building Insulation, Waterproofing and Dampproofing <br /> Page 3 of 7 <br /> CADocuments and settingsUynnMLocal Settings\Temporary Internet Files\OLK2C\IRCJ Video Vis GMP Clarifications Rev2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.