Laserfiche WebLink
Peter <br /> Indian River County Sheriff's Office <br /> Video Visitation & Visitor's Center <br /> Revised GMP Proposal <br /> August 25, 2006 <br /> 6. The costs contained within the Proposal , unless specifically noted otherwise, are based <br /> upon manufacturer's standard listings of colors , finishes , etc . <br /> 7. It is assumed that retainage will not be held on CM bonds, insurances , quality control <br /> testing and General Condition items in accordance with Article 7. 1 . 7 of the CM <br /> Agreement-for-the IRC- Jail -Expansion-2005. -CM--General - Condition--items --will be - - - <br /> negotiated as a lump sum amount and isolated as a separate line item in the GMP. The <br /> Lump Sum General Conditions will be billed in one installment in the first payment <br /> application after commencement of the work. <br /> 8 . Sales Tax Savings Program is not included for this scope of work. The electrical <br /> component is very labor intensive and there are not sufficient materials to overcome the <br /> threshold for direct purchases. The visitation units are custom fabricated items utilizing <br /> materials from several suppliers that are integrated to become one final product, thus <br /> they do not meet the criteria as outlined in the TAA for the Sales Tax Savings Program . <br /> 9. This GMP is valid from date of issuance (8/25106) and assumes work to be accepted <br /> and a Notice to Proceed to be received by Peter R. Brown Construction, Inc. no later <br /> than 9115/06 . It is assumed that this scope of work will be executed concurrently with <br /> the other detention electronic security system installations and will be completed within <br /> the existing Contract Time of the Jail Expansion . Additional General Conditions costs <br /> required for project specific items are included in this proposal . Other supervision and <br /> general monthly expenses have not been duplicated in this proposal . If the work is <br /> delayed , additional General Conditions will apply at the currently contracted monthly <br /> rate. <br /> 10. Electronic copies of record drawings are not included . Two sets of record drawings will <br /> be provided to Indian River County Sheriff's Office at the completion of the project <br /> indicating all modifications in colored ink. <br /> 11 . The costs for temporary power and water are not included . Existing utility services will <br /> be used at not cost to the Construction Manager. <br /> 12. Additional temporary toilet facilities and dumpsters are not included as it is assumed that <br /> the Jail Expansion facilities will be utilized . <br /> 13. Fire extinguishers , temporary barricades and job safety signs are included to meet <br /> OSHA standards and regulations . <br /> 14 . Progress cleaning is included ; however, final cleaning costs are not included . <br /> 15 . The demolition , abatement, removal or disposal of any contaminated , hazardous <br /> materials including but not limited to asbestos , toxic saturated materials, as well as any <br /> other unforeseen subsurface conditions such as sink holes, unsuitable soils and <br /> abandoned utilities are not included . Hazardous materials surveys or engineering are <br /> excluded as well . <br /> Page 2 of 7 <br /> M:12006 ProjectsURC Jail\Video VisitatioMESTIMATE SUBMITTAL DOCUMENTSIIRCJ Video Vis GMP Clarifications Rev,doc <br />