Laserfiche WebLink
r <br /> DIVISION 1 — GENERAL REQUIREMENTS <br /> r <br /> Section 1A - Scone of Work <br /> The project consists of furnishing all labor, materials, equipment, and services necessary to <br /> clear and dispose of all trees and vegetation as shown on the drawings and described in <br /> ' C n _ 1 1 l. . . a __ _ . L•___ _ . _ J i _ �L _ r_ 11 _ __ .. � ,_ . <br /> r mese specifications . Scope includes , but not 111111LGU LU L11G W11OWL11�; . <br /> • Clear trees and brush one-inch in diameter or greater. Cut to a minimum height of <br /> 2 " above existing grade . <br /> • Trim, protect and leave standing trees designated to remain. <br /> r • Completely remove and dispose of all vegetative debris within the limits designated <br /> on the plans . <br /> • Remove and dispose of existing concrete sidewalk shown on the Oslo Road <br /> clearing plans . <br /> • Transplant 70 cabbage palm trees from project site to the County ' s Harmony Oaks <br /> mitigation area at Vero Shores (approx. 7 miles) . Transplant 2 oak trees to South <br /> County Park. Trees to be relocated will be designated by the County. <br /> Section 1B - Photographs <br /> CONTRACTOR shall take photographs of all work areas prior to construction and <br /> _ all unusual conditions during construction. <br /> Section 1C - Permits <br /> The OWNER has applied for the Indian River County Right-of-Way Clearing <br /> _ Permit. <br /> Section 1D - Protection of Public <br /> r <br /> CONTRACTOR shall erect and maintain sufficient safeguards around all clearing <br /> and grubbing operations, to protect the public from work area hazards . <br /> r <br /> r <br /> r <br /> Page 14 of 40 <br /> r <br />