Laserfiche WebLink
DIVISION 2 - MAINTENANCE OF TRAFFIC <br /> Section 2A — Maintenance of Traffic <br /> 1 . Contractor shall maintain traffic within the limits of the project for the duration of <br /> the clearing operation in accordance with the U . S . Department of Transportation ' s <br /> Manual on Uniform Traffic Control Devices (MU 1 CD) latest edition, FDO T1 index <br /> 600 Series and FDOT Standard Specification Section 102 . <br /> 2 . Cost of Maintenance of Traffic shall be Lump Sum . <br /> Section 2B — Protection of Public <br /> 1 . Provide, erect and maintain barriers, lights and other devices as required to protect <br /> general public , workers and adjoining property . <br /> 2 . There shall be no separate payment for protection of public . The cost shall be <br /> included in the Lump Sum Price for Maintenance of Traffic . <br /> DIVISION 3 - SITE WORK <br /> Section 3A — Clearing <br /> 1 . Trim back trees and brush that extend into area designated on plans to be cleared . <br /> 2 . Clear trees and brush one inch in diameter or greater from designated clearing area, <br /> except trees and brush designated in field to remain . <br /> 3 . Cut to a minimum height of 2" above existing grade . <br /> 4 . Backfill any holes or depressions resulting from clearing operations . <br /> 5 . Completely remove and dispose of all cleared materials . <br /> 6 . Cost of all work under this Section shall be included in the lump sum for clearing. <br /> Pave 15 o' 40 <br />