My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-025
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2016 1:33:55 PM
Creation date
9/30/2015 11:55:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/22/2008
Control Number
2008-025
Agenda Item Number
7.L.
Entity Name
Clear Zone Maintenance
Subject
Oslo Road Clearing 43rd Ave. Clearing
Area
31st. Ave.SW -43rd. Ave. 6th Pl. SW - South Relief Canal
Bid Number
2008013
Supplemental fields
SmeadsoftID
6846
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 2 - MAINTENANCE OF TRAFFIC <br /> Section 2A — Maintenance of Traffic <br /> 1 . Contractor shall maintain traffic within the limits of the project for the duration of <br /> the clearing operation in accordance with the U . S . Department of Transportation ' s <br /> Manual on Uniform Traffic Control Devices (MU 1 CD) latest edition, FDO T1 index <br /> 600 Series and FDOT Standard Specification Section 102 . <br /> 2 . Cost of Maintenance of Traffic shall be Lump Sum . <br /> Section 2B — Protection of Public <br /> 1 . Provide, erect and maintain barriers, lights and other devices as required to protect <br /> general public , workers and adjoining property . <br /> 2 . There shall be no separate payment for protection of public . The cost shall be <br /> included in the Lump Sum Price for Maintenance of Traffic . <br /> DIVISION 3 - SITE WORK <br /> Section 3A — Clearing <br /> 1 . Trim back trees and brush that extend into area designated on plans to be cleared . <br /> 2 . Clear trees and brush one inch in diameter or greater from designated clearing area, <br /> except trees and brush designated in field to remain . <br /> 3 . Cut to a minimum height of 2" above existing grade . <br /> 4 . Backfill any holes or depressions resulting from clearing operations . <br /> 5 . Completely remove and dispose of all cleared materials . <br /> 6 . Cost of all work under this Section shall be included in the lump sum for clearing. <br /> Pave 15 o' 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.