My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-086
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2016 12:07:22 PM
Creation date
10/1/2015 3:24:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/24/2009
Control Number
2009-086
Agenda Item Number
12.I.1
Entity Name
Coastal Technology Corporation
Subject
Sector 3 Beach and Dune Restoration Work Order No.4
Area
Sector 3 Beach
Supplemental fields
SmeadsoftID
10539
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Upland Sand Source Evaluation <br /> Scope or work. <br /> Task lb — Evaluation of Proposals : COASTAL TECH will review the data submitted to the <br /> COUNTY by prospective suppliers for compliance with the minimum Geotechnical Standards ; based <br /> upon this review , COASTAL TECH will rank the top potential suppliers for further analysis (up to <br /> six ( 6) respondents ) . COASTAL TECH will meet with the COUNTY to review the results <br /> and <br /> confirm the prospective suppliers to be further assessed . <br /> For the top 6 potential suppliers , COASTAL TECH will review the "upland sand assays" and rank the <br /> overall ability of the prospective bidder to meet the requirements of the Solicitation — as represented <br /> by the prospective supplier . COASTAL TECH will meet with the COUNTY to review the results . <br /> TASK 2 — SECTOR 3 PROJECT <br /> In general , for the Sector 3 Beach and Dune Restoration Project , subsequent to a written Notice- to - <br /> Proceed from the COUNTY , COASTAL TECH will formulate an alternate design employing the <br /> upland sources , prepare and submit a proposed modification to the existing JCP application , and <br /> process the JCP modification request via the Florida Department of Environmental Protection ( FDEP ) <br /> and U . S . Army Corps of Engineers (USACE) . <br /> Task 2a — Alternate Preliminary Design : In general , COASTAL TECH will prepare an alternate <br /> preliminary design for the Sector 3 Project employing the top two ( 2) upland sand sources as <br /> determined under Task 1 . Each alternate design shall include : <br /> ■ revisions to design templates and initial fill volume to maintain a "No Impact" (to existing <br /> hardbottom ) design , <br /> ■ an Opinion of Probable Costs for initial construction — based upon the unit prices obtained <br /> under Task 1 , <br /> ■ assessment of the re-nourishment interval and determination of probable annual maintenance <br /> costs based upon unit costs associated with other truck-haul projects completed within Indian <br /> River County over the past year, <br /> ■ identification of potential staging and placement areas , <br /> ■ Preparation of 81 /2 " by 11 " preliminary design Drawings (plan and cross - section) and the <br /> existing permit sketches to be submitted <br /> Upon completion of the assessment of the two ( 2) upland sand sources , COASTAL TECH will <br /> prepare a Design Document Addendum and provide five ( 5 ) copies of the Design Document <br /> Addendum to the COUNTY . COASTAL TECH will meet with the COUNTY to review the above and <br /> subsequently incorporate revisions as may be required by the COUNTY . <br /> Task 2b — EA Modification : COASTAL TECH will review the existing Environmental Assessment <br /> (EA) to identify appropriate revisions to the EA . COASTAL TECH will confer with the COUNTY <br /> and the COUNTY ' s EA consultant ( Dial - Cordy & Associates , Inc . ) to identify , prepare and <br /> incorporate appropriate revisions to the EA to reflect the alternate use of the upland sand sources . <br /> Task 2c — JCP Modification Request : COASTAL TECH will prepare and submit a JCP <br /> modification request incorporating the Design Document Addendum and the revised EA prepared <br /> under Tasks 2a and 2b respectively . The COUNTY will provide any JCP modification fee as may be <br /> required by FDEP . COASTAL TECH will review the draft permit modification request with the <br /> COUNTY and incorporate revisions as appropriate — prior to submitting the application to FDEP and <br /> USACE . <br /> Task 2d — JCP Modification Processing : Subsequent to submittal of the JCP modification request , <br /> COASTAL TECH will serve as the COUNTY ' s agent for processing of the application through <br /> FDEP and the USACE . COASTAL TECH will make informal contact with FDEP and USACE staff <br /> Page 2 of 3 <br /> March 17. 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.