Laserfiche WebLink
Attachment 1 TO WORK ORDER CT -2 for Professional Services <br />WABASSO BEACH PARK RESTORATION <br />MASTER LIFT STATION AND FORCE MAIN CONNECTION <br />INTRODUCTION <br />During the Board of County Commissioners meeting of June 13, 2006 the Board approved Work Order CT - <br />1 for the restoration of Wabasso Beach Park. The scope of that Work Order included the design of the site <br />lift station "based upon services to the park restroom facility". This Work Order, CT -2, requires the <br />CONSULTANT to redesign the lift station included in Work Order CT -1. This Scope of Work entails design <br />services to provide a master lift station at a location and as required by the Indian River County Utilities <br />Department. This master lift station will serve the Wabasso Beach Park facilities and be capable of serving <br />a minimum of approximately one quarter mile gravity sewer main with discharge connection to the existing <br />force main system in State Road A -1-A, adjacent to the lift station site. <br />Services are proposed under <br />the Continuing <br />Contract Agreement for Professional Services between <br />COUNTY and CONSULTANT, <br />dated December 13, <br />2005. CONSULTANT shall sub -contract water and <br />sewer related services to Carter <br />Associates, Inc. <br />(CAI). <br />The following describes the work. <br />SCOPE <br />ITEM I -PROJECT ADMINISTRATION <br />A. Project Management. Provide project management and quality control during design of the <br />project. <br />B. Administration. Provide services such as: contracting, filing, mailing, reproduction, and <br />deliveries. <br />C. Project Meeting. Meet with IRCDUS Operating and Engineering staff to obtain variances <br />from County Specifications needed to construct proposed facility at desired location. <br />ITEM II -DESIGN <br />A. Pre -Design Site Visit. Visit the site to determine additional requirements or conflicts <br />anticipated with installation of a "Master" lift station. Take digital pictures of existing <br />conditions. Identify possible site limitations and easement requirements. <br />B. Master Lift Station Design. Determine "Master" lift station service area based on IRCDUS <br />requested design criteria. Prepare project calculations and design report for replacing the <br />proposed private lift station with the requested "Master" lift station. Revise lift station design <br />template for a caisson installation rather than open hole. <br />C. Cost Estimate. Prepare a unitized cost estimate for the "Master" lift station installation. <br />CADocuments <br />and Settings\administrator.COASTAL\Local <br />Settings\Temporary Internet <br />Files\Content.OutlookwJXIV6PM\WORK ORDER NO <br />CT -2 2-19-08.doc <br />