Laserfiche WebLink
Attachment 1 TO WORK ORDER CT-2 for Professional Services <br /> WABASSO BEACH PARK RESTORATION <br /> MASTER LIFT STATION AND FORCE MAIN CONNECTION <br /> INTRODUCTION <br /> During the Board of County Commissioners meeting of June 13, 2006 the Board approved Work Order CT- <br /> 1 for the restoration of Wabasso Beach Park. The scope of that Work Order included the design of the site <br /> lift station "based upon services to the park restroom facility" . This Work Order, CT-2 , requires the <br /> CONSULTANT to redesign the lift station included in Work Order CT- 1 . This Scope of Work entails design <br /> services to provide a master lift station at a location and as required by the Indian River County Utilities <br /> Department. This master lift station will serve the Wabasso Beach Park facilities and be capable of serving <br /> a minimum of approximately one quarter mile gravity sewer main with discharge connection to the existing <br /> force main system in State Road A-1 -A, adjacent to the lift station site. <br /> Services are proposed under the Continuing Contract Agreement for Professional Services between <br /> COUNTY and CONSULTANT, dated December 13 , 2005. CONSULTANT shall sub-contract water and <br /> sewer related services to Carter Associates, Inc. (CAI) . The following describes the work. <br /> SCOPE <br /> ITEM I - PROJECT ADMINISTRATION <br /> A . Project Management. Provide project management and quality control during design of the <br /> project . <br /> B . Administration . Provide services such as : contracting , filing , mailing , reproduction , and <br /> deliveries . <br /> C. Project Meeting . Meet with IRCDUS Operating and Engineering staff to obtain variances <br /> from County Specifications needed to construct proposed facility at desired location . <br /> ITEM II - DESIGN <br /> A . Pre-Design Site Visit . Visit the site to determine additional requirements or conflicts <br /> anticipated with installation of a " Master" lift station . Take digital pictures of existing <br /> conditions . Identify possible site limitations and easement requirements . <br /> B . Master Lift Station Design . Determine " Master" lift station service area based on IRCDUS <br /> requested design criteria . Prepare project calculations and design report for replacing the <br /> proposed private lift station with the requested " Master" lift station . Revise lift station design <br /> template for a caisson installation rather than open hole . <br /> C . Cost Estimate . Prepare a unitized cost estimate for the "Master" lift station installation . <br /> CADocuments and Settings\administrator.COASTAL\Local Settings\Temporary Internet Files\Content.OutlookwJXIV6PM\WORK ORDER NO <br /> CT-2 2-19-08.doc <br />