Laserfiche WebLink
ITEM III — CONSTRUCTION PLANS AND SPECIFICATIONS <br />A. Master Lift Station. Prepare plan for "Master lift station. Prepare "Master' lift station detail <br />sheets with revised wet well for caisson construction. <br />B. "Off -Site" Sewer. Revise profile drawing of "Master' lift station and force main. <br />C. Master Lift Station Specifications. Revise submersible pump station specification from <br />private lift station design to comply with "Master" lift station design. <br />DELIVERABLES <br />A. Preliminary design <br />(shall be considered 60 <br />percent design review <br />submittal) - provide one <br />copy each of structural and civil construction <br />drawings together with <br />one copy of the technical <br />specifications. Also <br />provide quality control comments on the 60 percent <br />review submittal. <br />B. Final design (shall be 100 percent review submittal) - provide one copy each of all drawings <br />and technical specifications compatible with EJCDC 1996 General Conditions and provide digital <br />AutoCAD drawing files 2005 edition or later and digital word document files of the technical <br />specifications. Also provide one copy of the itemized opinion of probable construction cost. <br />C. Conformed sets - After the project is bid but before the COUNTY awards the construction <br />contract, provide five signed and sealed copies of the conformed contract drawings and five <br />signed and sealed sets of the confirmed technical specifications. Further any revisions to <br />the above digital drawing and document files shall be provided. <br />END ATTACHMENT 1 <br />=ocuments <br />and Settings\administrator.COASTAL\Local <br />SettingsUemporary Internet <br />Files\Content.Outlook\JJXIV6PM\WORK <br />ORDER NO <br />CT -2 2-19-08.doc <br />