My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-317
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 2:01:22 PM
Creation date
10/1/2015 12:41:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/23/2008
Control Number
2008-317
Agenda Item Number
12.J.5
Entity Name
Boyle Engineering Corp.
Subject
College Lane Water Main Privity Agreement
Supplemental fields
SmeadsoftID
7617
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br /> SERVICES , COMPENSATION , AND TIME FOR COMPLETION <br /> This Work Order No . 1 is in accordance with the existing AGREEMENT dated August 22 , 2002 between <br /> LBFH, Inc . (Boyle Engineering Corp . ) (ENGINEER) and Indian River Community College ( IRCC ) . This <br /> Work Order No . 1 is issued to ENGINEER by Indian River County ( COUNTY ) piggy backing on the <br /> agreement between the ENGINEER and IRCC , amended as follows : <br /> SECTION I — PROJECT LIMITS <br /> This Work Order No . 1 is for the ENGINEER to perform an additional design related to the Indian River <br /> County/Indian River Community College- College Lane Extension and Bridge Replacement project located <br /> in Indian River County and lying in a portion of Sections 5 and 8 , Township 33 South , Range 39 East . <br /> SECTION II — SCOPE OF SERVICES <br /> As agreed upon between ENGINEER and COUNTY , ENGINEER shall provide Professional <br /> Engineering services to complete all tasks as outlined in this Work Order No . 1 described as follows : <br /> • Utility Design : <br /> 1 . Boyle will modify the existing construction plans for the College Lane Extension and <br /> Bridge Replacement project to include the extension of a 16- inch water main from a <br /> connection point at the existing 12- inch water main along the north side of the IRCC <br /> campus near the west end of the existing College Lane , terminating at the west end of the <br /> intersection of College Lane and 66`h Avenue . The water main will be located on the <br /> north side of the right-of- way , will cross the road east of the bridge and cross the <br /> IRFWCD Lateral A Canal on the south side of the bridge . The water main will be <br /> designed to meet Indian River County Department of Utility Services (IRCUSD) <br /> standards and FDEP requirements . <br /> 2 . This design assumes that there is 3 , 800 LF of 16- inch water main located at the back of <br /> the proposed sidewalk, with fire hydrants spaced at every 500-feet, sampling points at <br /> ever 1 ,200-feet and at dead ends, valves at every 1 ,500-feet, air relief valves at all high <br /> points , up to 5 conflicts with proposed utilities and 2 directional drills underneath the <br /> existing IRCC driveways . This design also assumes that there will be no aerial canal <br /> crossings or design of jack and bore installations, structural or retaining wall design , and <br /> conflicts with existing or proposed landscaping , or additional survey . These services , if <br /> required , will be provided upon addition l approvals from the COUNTY . <br /> 3 . Construction Drawings that are 90% complete will be used to make the FDEP submittal <br /> on behalf of the COUNTY . ENGINEER shall respond to as many as one ( 1 ) Request <br /> for Additional Information (RAI) from the FDEP . The COUNTY shall pay FDEP the <br /> permitting fees directly . <br /> 4 . ENGINEER shall prepare project specifications for the construction of the 16-inch water <br /> main for inclusion in the College Lane Extension and Bridge Replacement project <br /> specifications manual . It is assumed that these projects will be bid , awarded and <br /> constructed as a single-phased project. <br /> 5 . The permitted drawings will be incorporated into the 100% complete construction <br /> drawings for the College Lane Extension & Bridge Replacement project. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.