My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-317
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 2:01:22 PM
Creation date
10/1/2015 12:41:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/23/2008
Control Number
2008-317
Agenda Item Number
12.J.5
Entity Name
Boyle Engineering Corp.
Subject
College Lane Water Main Privity Agreement
Supplemental fields
SmeadsoftID
7617
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 . ENGINEER shall provide limited construction observation services such that an <br /> engineering certification can be made regarding the construction of the proposed <br /> improvements . The purpose of the limited project representation is to provide <br /> construction observation of the progress and quality of the construction work, and to <br /> determine, in general , if the construction is proceeding in accordance with the contract <br /> documents . The services provided are not intended to be comprehensive or exhaustive in <br /> nature, and shall in no way relieve the contractor from their complete responsibility of the <br /> means , methods , sequence of construction and construction site safety . <br /> 7 . ENGINEER shall review shop drawings for any components related to the <br /> improvements designed by the ENGINEER . Shop drawings shall be forwarded to <br /> applicable agencies for their final review and approval as necessary . <br /> 8 . At the conclusion of the work, ENGINEER will prepare certification of the completed <br /> work based on certified record drawing information prepared by a Florida licensed <br /> Professional Surveyor and Mapper that is to be retained by the contractor . <br /> SECTION III — TIME FOR COMPLETION <br /> This project shall follow the same timeline as the College Lane Extension and Bridge Replacement project . <br /> SECTION IV — DELIVERABLEIWORK PRODUCT <br /> 1 . Deliverables shall consist of the same as those defined for the College Lane Extension <br /> and Bridge Replacement project . <br /> SECTION V — COMPENSATION <br /> The COUNTY agrees to pay , and the ENGINEER agrees to accept, for services rendered as identified in <br /> Sections II , III , and IV of this Work Order No . 1 a lump sum fee of $20,000.00 . <br /> PA05 -035 hproposaRWORK ORDER NO . 1 Engineering Services .doc <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.