Laserfiche WebLink
professional opinict the cost of construction based on . 1211 develop mcnt at t <br /> phase . <br /> Roadwav and Bridge Construction Plan Review <br /> The Engineer shall prepare one set of 6017- t, construction plans for the roadway and briduc <br /> for each of the followine entities : <br /> • Indian River Community College <br /> Indian River County <br /> Carter Associates . lnc . ( for internal QA/QC ) <br /> The Engineer- and sub,,consultants shall attend one meeting with the College and Indian <br /> Rivcr County staff to review the 60 % submittal and to discuss any updated conceptual <br /> plans . <br /> 2.8 90 % Construction I'lans Whase 220 : Upon receipt of' written comments from ( tic <br /> College . Indian River County staff, and Carter Associates , Inc . on the 6017r- construction <br /> pians and specifications , and authorization to proceed to the next phase , comments will <br /> be incorporated into the 90% construction plans and specifications . <br /> Roadway <br /> The Engineer shall continue the design of the stormwater management system ; prepare <br /> roadway plans , including plan and profile sheets ; prepare signage and pavement marking <br /> sheets ; prepare proposed roadway cross sections ; prepare detention pond plan sheets ; <br /> prepare detention pond cross sections ; prepare a detailed hydraulic model of the proposed <br /> design ; prepare detail sheets ; prepare technical specifications , prepare project quantity take- <br /> offs and summary of quantities table . All drainage items will he included in a separate <br /> category within the summary of quantities table . Prepare a project manual , including front - <br /> end documents , based on the College ' s standard format. The Engineer shall also provide <br /> an updated professional opinion of the cost of construction based on design development <br /> at this phase . <br /> Brill e <br /> The Engineer shall complete bridge final design and bridge detailed plans for <br /> construction that generally follow current FDOT structural guidelines and will use the <br /> AASHTO Standard Specification for Bridge Design (Latest Edition as of' date of this <br /> agreement) , unless specifically directed by the College at the beginning of work to use the <br /> AASHTO LRFD Specification (Latest Edition as of date of this Agreement ) . if there are <br /> distinct advantages to not following certain guidelines , the Engineer shall advise the <br /> College concerning these items . The Engineer shall provide an updated professional <br /> opinion of the cost of construction along with the detailed ( 909. ) plans , Technical <br /> Specifications for Bridge Construction . Quantities and Bridge Bid Forms . Note that Pile <br /> Scour studies are NOT part of this scope of services . <br /> IRCC-Asstgnmenr Aruhori;ation , March 2000 05-Q351 <br /> .Mueller Campus College bane Roadwa.v Extension & Bridge Construction 5 of 15 <br />