Laserfiche WebLink
Roadway and Bridge Construction Plan Review <br /> The Engineer shall prepare one set of 90% construction plans for the roadway and bridge for each of the following entities <br />: <br /> • Indian River Community College <br /> 0 Indian River County <br /> • Carter Associates . Inc . ( for internal QA/QC ) <br /> The Engineer and sub-consultants shall attend one meeting with the College and Indian <br /> River County staff to review the 90% submittal and to discuss any updated conceptual <br /> plans . <br /> 2. 9 Water Management District I'ernutting for the Roadway and Bridge Design (Phase 41 ) : <br /> The Engineer shall prepare for the College ' s signature , permit applications for the following <br /> permits : <br /> S.IRWMD ( Modification of ERP - Drainage ) <br /> • IRFWCD (Drainage Connection ) <br /> The Engineer will make the submittal on behalf of the College using the 90 % <br /> construction plans and shall respond to one ( 1 ) Request for Additional Information ( RAI) <br /> from each agency. <br /> 2. 10 Other Permitting (Phase 49 ) : The Engineer shall prepare for the College ' s signature , permit <br /> applications for the following permits , as applicable : <br /> • Florida Department of Environmental Protection — National Pollutant Discharge <br /> Elimination System Permitting-Including preparation of a draft Stormwater <br /> Pollution Prevention Plan <br /> • Indian River County (Driveway Connection ) <br /> The Engineer will make the submittal on behalf of the Collegd using the 90% <br /> construction plans and shall respond to one ( 1 ) Request for Additional Information (RAI) <br /> from each agency. <br /> 2. 11 Final ( 100 % ) Construction Plans (Phase 23 ) : Upon receipt of written comments from <br /> College, Indian River County staff, Carter Associates , Inc . on the 90 % construction plans <br /> and specifications , and from applicable regulatory agencies , and authorization to proceed <br /> to the next phase , comments will be incorporated into the final ( 100 % ) construction plans <br /> IRCC-Assignment Authorization , March 2006 05 -0351 <br /> Mr+ eller Campus Callege Lanc Roadwm Extension & Bridge Constnictinn 6 of 15 <br />