My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-317
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 2:01:22 PM
Creation date
10/1/2015 12:41:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/23/2008
Control Number
2008-317
Agenda Item Number
12.J.5
Entity Name
Boyle Engineering Corp.
Subject
College Lane Water Main Privity Agreement
Supplemental fields
SmeadsoftID
7617
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roadway and Bridge Construction Plan Review <br /> The Engineer shall prepare one set of 90% construction plans for the roadway and bridge for each of the following entities <br />: <br /> • Indian River Community College <br /> 0 Indian River County <br /> • Carter Associates . Inc . ( for internal QA/QC ) <br /> The Engineer and sub-consultants shall attend one meeting with the College and Indian <br /> River County staff to review the 90% submittal and to discuss any updated conceptual <br /> plans . <br /> 2. 9 Water Management District I'ernutting for the Roadway and Bridge Design (Phase 41 ) : <br /> The Engineer shall prepare for the College ' s signature , permit applications for the following <br /> permits : <br /> S.IRWMD ( Modification of ERP - Drainage ) <br /> • IRFWCD (Drainage Connection ) <br /> The Engineer will make the submittal on behalf of the College using the 90 % <br /> construction plans and shall respond to one ( 1 ) Request for Additional Information ( RAI) <br /> from each agency. <br /> 2. 10 Other Permitting (Phase 49 ) : The Engineer shall prepare for the College ' s signature , permit <br /> applications for the following permits , as applicable : <br /> • Florida Department of Environmental Protection — National Pollutant Discharge <br /> Elimination System Permitting-Including preparation of a draft Stormwater <br /> Pollution Prevention Plan <br /> • Indian River County (Driveway Connection ) <br /> The Engineer will make the submittal on behalf of the Collegd using the 90% <br /> construction plans and shall respond to one ( 1 ) Request for Additional Information (RAI) <br /> from each agency. <br /> 2. 11 Final ( 100 % ) Construction Plans (Phase 23 ) : Upon receipt of written comments from <br /> College, Indian River County staff, Carter Associates , Inc . on the 90 % construction plans <br /> and specifications , and from applicable regulatory agencies , and authorization to proceed <br /> to the next phase , comments will be incorporated into the final ( 100 % ) construction plans <br /> IRCC-Assignment Authorization , March 2006 05 -0351 <br /> Mr+ eller Campus Callege Lanc Roadwm Extension & Bridge Constnictinn 6 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.