Laserfiche WebLink
GENERAL PROJECT DESCRIPTION <br /> 1 . 1 Location : The Project consists of the approximately 3 , 200 foot long extension of College <br /> Lane on the College ' s Mueller Campus and an approximately 70 foot long bridge <br /> spanning the Indian River Farms Water Control District ' s ( IRFWCD ) Lateral ` A ' Canal , <br /> as shown on attached Exhibit A . All areas lying and being in Sections 5 & 8 , Township <br /> 33 South , Range 39 East , in Indian River County , Florida . <br /> 1 .2 Nature, Character and Extent of the Project : The Project consists of the design , <br /> surveying , geographic information systems development , preparation of permit <br /> applications , preparation of a project manual , preparation of cost estimates and services <br /> during construction for the College Lane roadway extension and bridge construction <br /> proposed north of the IRFL'VCD ' s Main Canal from the western extent of College Lane to <br /> 00"' Avenue . The Project includes . but is not limited to , the construction of an undivided . <br /> two lane asphalt road, a metal or concrete bridge consisting of three lanes and a sidewalk <br /> spanning the IRFWCD ° s Lateral ' A ' Canal and their associated drainage and utility <br /> appurtenances . <br /> ARTICLE 2 <br /> SCOPE OF SERVICES <br /> 2. 1 Topographic Survey (Phase 12) : The Engineer shall retain Carter Associates , Inc . as a <br /> sub-consultant to provide topographic surveying services for this project . The <br /> topographic survey of the College Lane extension and bridge construction . and associated <br /> improvements shall include the following : <br /> 1 . The Engineer shall prepare a survey drawing prepared by a licensed and registered <br /> Florida Professional Surveyor and Mapper which meets the minimum technical <br /> standards set forth by the Florida Board of Professional Surveyors and Mappers in <br /> Chapter 61G17 , Florida Administrative Code pursuant to Section 472 . 027 , Florida <br /> Statutes . The specific purpose survey will be tied to and projected in the state plane <br /> coordinate system , Florida East Zone ( 901 ) and referenced to the North American <br /> Datum of 1983 , Adjustment of 1999 . <br /> 2 . The Engineer shall establish vertical control for topographic survey in National <br /> Geodetic Vertical Datum of 1929 . <br /> 3 . The Engineer shall prepare cross sections of the proposed College Lane Extension at <br /> 100 foot intervals within 100 feet of the proposed centerline . <br /> 4 . The Engineer shall prepare cross sections of Indian River Farms Water Control <br /> District ' s ( IRF'WCD ) Lateral " A " Canal lying immediately Nvest of and adjacent to the <br /> subject parcel at 100 foot intervals . <br /> IRCC-Av4gnmenr Awhonzatron, ,March 20*5 05- 035 1 <br /> Mueller Campus College Lane Roadway Extension d: Bridge Cnrrstnicrinn 2 of 15 <br />