My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-317
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 2:01:22 PM
Creation date
10/1/2015 12:41:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/23/2008
Control Number
2008-317
Agenda Item Number
12.J.5
Entity Name
Boyle Engineering Corp.
Subject
College Lane Water Main Privity Agreement
Supplemental fields
SmeadsoftID
7617
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
preliminary table o . intents for the project technical spec ations and a professional <br /> opinion of the cost of construction based on design development at this phase . <br /> Rrid�e _ <br /> The Engineer shall produce preliminary bridge plans , showing key geometric <br /> requirements, basic member sizes , how utilities are to be carried on the hedge , and other <br /> items pertaining to the function of the bridge . The Engineer shall also provide a <br /> professional opinion of the cost of construction based on design development at this <br /> phase . <br /> Roadway and BrOce Construction Plan Review <br /> The Engineer shall prepare one set of 30% construction plans for the roadway and bridge <br /> for each of the following entities : <br /> • Indian River Community College <br /> • Indian River County <br /> Carter Associates , Inc . ( for internal QA/QC ) <br /> The Engineer and sub-consultants shall attend one meeting with the College and Indian <br /> River County staff' to review the 30% submittal and to discuss any updated conceptual <br /> plans . <br /> 2.7 60 % Construction Plans (Phase 22B ) : Upon receipt of written comments from the <br /> College and Indian River County staff, and Carter Associates , Inc . on the 30% <br /> construction plans and specifications , and authorization to Proceed to the next phase has <br /> been received by the Engineer, comments will. be incorporated into the 60 % construction <br /> plans and specifications . <br /> Roadway <br /> The Engineer shall prepare a preliminary stormwater design ; develop preliminary <br /> roadway cross sections based on Indian River County "collector" roadway standards , <br /> develop plans and sections for the proposed detention pends based on required water <br /> quality and attenuation criteria ; prepare a preliminary hydraulic model of the proposed <br /> design ; prepare preliminary detail sheets ; prepare preliminary summary of quantities sheet <br /> based on MOT standard item numbers ; and prepare draft technical specifications based <br /> on design development at this phase . The Engineer shall also provide an updated <br /> professional opinion of the cost of construction based on design development at this <br /> phase . <br /> Brulxe <br /> The Engineer shall produce 60%r bridge construction plans , update key geometric <br /> requirements , basic member sizes , how utilities are to be carried on the bridge , and other <br /> items pertaining to the function of the bridge . The Engineer shall also provide an updated <br /> IRC, C•Assignmeni Auihorizwion, March 2000 05 - 0351 <br /> Weller Campus College lane Roadivav Extension d Bridge Constrioction 4 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.