My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-317
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 2:01:22 PM
Creation date
10/1/2015 12:41:34 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County h one set of prints each of the Recort ravings and copies of all <br /> agency certifications for their records . Additionally, the Engineer shall provide bridge <br /> rating calculations based on Load Resistance Factor Rating methodology. One set of the <br /> bridge rating calculations each will be submitted to the College and Indian River County <br /> their records . <br /> 2. 16 Sketch & Legal Description of Right-of- Way (Phase 15 ) : The Engineer shall prepare a <br /> sketch and legal description of the road right-of-way of for the project for the purposes of <br /> the transfer of ownership from the College to Indian River County. The sketch and legal <br /> description shall be signed and sealed by a licensed and registered Florida Professional <br /> Surveyor and Mapper. <br /> 2. 17 Direct Expense Items (Phase REIM) : Any direct , non - salary expense including but not <br /> limited to , photocopies , blueprints , out -of-office reproductions or photographic services , <br /> long distance telephone calls , special mailing or delivery services , and contract services <br /> authorized by the College . <br /> IRCC-Assignment Authorization, March 2006 05-03.51 <br /> Mueller Campus College Lane Roadway Extension & Bridge Construction 10 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.