My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-317
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 2:01:22 PM
Creation date
10/1/2015 12:41:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/23/2008
Control Number
2008-317
Agenda Item Number
12.J.5
Entity Name
Boyle Engineering Corp.
Subject
College Lane Water Main Privity Agreement
Supplemental fields
SmeadsoftID
7617
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIME OF PERFORMANCE <br /> The estimated days for the Engineer to complete Sections 4. 1 , 4 . 2 & 4 . 5 are from the date the <br /> Engineer receives Notification To Proceed ( NTP ) from College . The estimated days for the <br /> Engineer to complete Sections 4 . 11 & 4 . 12 are from the receipt of all permits from applicahlc <br /> agencies . <br /> The time periods for the performance of Engineer's services are as follows : <br /> Section Task Time Frame <br /> 4 . 1 Topographic Survey (Phase 12 ) 45 days from NTP <br /> 4 .2 Wetland Determination (Phase 05) 45 days from NTP <br /> 4 .3 Pre-Application Meetings (Phase 04) As Needed <br /> 4A Utility Coordination (Phase 27 ) As Needed <br /> 4 .5 Project Feasibility Report (Phase 21 ) 60 days from NTP <br /> 4.6 309b Construction Plans (Phase 22A ) 45 days from Comments on 4 . 5 <br /> 4.7 60 % Construction Plans (Phase 22B) 45 days from Comments on 4. 6 <br /> 4.8 90 % Construction Plans (Phase 22C) 45 days from Comments on 4 . 7 <br /> 4.9 Water Management District Permitting (Phase 41 ) 120 days from Comments on 4 . 7 <br /> 4 . 10 Other Permitting (Phase 49) 120 days from Comments on 4 . 7 <br /> 4. 11 Final ( 100 % ) Construction Plans (Phase 23) 30 days from Permit Receipt <br /> 4 . 12 Review of Bids & Bid Opening (Phase 62) 45 days from Approval of 4 . 11 <br /> 4 . 13 Design Team Meetings (Phase 50) As Needed <br /> 4. 14 GIS Services (Phase 18 ) 45 day from Certification <br /> 4 . 15 Services During Construction (Phase 60 ) 270 days from 4 . 12 <br /> 4. 16 Sketch & Legal Description (Phase 15 ) 60 days from 4 . 11 <br /> 4. 17 Direct Expenses (Phase REIM) As Needed <br /> ARTICLE 5 <br /> DUTIES OF COLLEGE <br /> The responsibilities of College , as described in the Agreement , are amended and supplemented as <br /> follows : <br /> 5. 1 Direct and coordinate any support work related to the Engineer' s contract , including hilt <br /> not limited to the location and identification of existing improveri-jents within the limits of <br /> the area to be developed on and across the College property . Engineer will provide <br /> technical elements of the work to assist College with this task . <br /> 1RC'C -Assignment Aulhorization, March 2006 05-0351 <br /> Mueller Campus College Lane Roadway Extension & Bridge Construclum 12 of 15 <br />