My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-317
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 2:01:22 PM
Creation date
10/1/2015 12:41:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/23/2008
Control Number
2008-317
Agenda Item Number
12.J.5
Entity Name
Boyle Engineering Corp.
Subject
College Lane Water Main Privity Agreement
Supplemental fields
SmeadsoftID
7617
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL PROVISIONS <br /> 6. 1 The College shall provide any legal services required as a part of the permitting process . _ <br /> 6.2 Permit or application fees shall be the responsibility of the College . <br /> 6.3 The College shall designate , in writing, one person to act as the College ' s representative <br /> with respect to the services to be rendered . Such person shall have complete authority to <br /> transmit instructions , receive information , interpret and define the CLIENT ' s policies and <br /> decisions with respect to LBFH , Inc . ' s services for the project . <br /> 6.4 The College shall assist Engineer, by placing at our disposal all available information <br /> pertinent to the project including previous reports , surveys and any other data relative to <br /> design or construction of the project . Where possible , and as applicable , this information <br /> shall be provided in electronic form . <br /> 6.5 Work in this Agreement includes our normal expeditious coordination and follow - up on <br /> permitting submittal with the agencies . Additional time expended by the Engineer to <br /> expedite permit processing because of the College ' s need for rapid permit approvals will <br /> be compensated for on a Time & Expense basis . <br /> 6.6 The Scope of Services in this Agreement does not include a "hydrological basin study" <br /> for the basin or sub-basin . It only includes the submittal of an application to SJRNVMD <br /> for an individual Environmental Resource Permit for the project site . Any remodeling of <br /> the existing system beyond the project site , if required by SJRWMD . would require an <br /> agreement for additional services from the College . <br /> 6. 7 The Scope of Services in this Agreement does not include any formal groundwater <br /> modeling (i . e . Theis or Mod Flow modeling) that may be required for the Water Use <br /> pennitting if environmental issues require it . <br /> IRCC-Assignment Authorization, March 2000 05 . 0351 <br /> Mueller Campus College Lane Roadway Extension & Bridge Consrruction 13 01 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.