Laserfiche WebLink
6.8 Our Scope of Servi only includes those services specif ' v described above . If" <br /> specific service is not identified, please do not assume that it will be performed . Other <br /> services that may be required include : <br /> • Landscape , lighting, irrigation , electrical or building plans . <br /> • The design of any off-site improvements . <br /> • Constriction stakeout . <br /> • Construction management . <br /> • Traffic or environmental impact study , if required . <br /> • Off- site roadway improvements . <br /> • Traffic signalization plans . <br /> • ACOE permitting . <br /> • Review of a title policy/commitment . <br /> • SJRWMD permitting for areas outside the limits of the project . <br /> • The preparation of a Wetland Mitigation and Monitoring Plan . <br /> • An environmental site assessment of the property to determine the existence of <br /> hazardous materials and/or petroleum products . <br /> • A geotechnical exploration program to determine the suitability of the on -site soils for <br /> use in the construction of the proposed buildings , roads and stormwater management <br /> system . <br /> • The cost of certified mailings for public hearings . <br /> • Attendance at Public Meetings . <br /> 1RCC -Assignment Authorization, March 2006 05 - 0351 <br /> Mueller Campus College Larte Roadway Extension & Bridge Construction 14 of 15 <br />