My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-287
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 11:54:18 AM
Creation date
10/1/2015 12:36:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
09/09/2008
Control Number
2008-287
Agenda Item Number
12.J.1
Entity Name
Florida Department of Environmental Protection
Subject
Consent Order South Reverse Osmosis Water Treatment Plant
Discharge Monitoring Reports
Area
South Reverse Osmosis Water Treatment Plant
Project Number
OGC 08-1661
Supplemental fields
SmeadsoftID
7570
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3319 Maguire Boulevard Suite 232 <br /> Orlando , Florida 32803 - 3767 <br /> g . Test Failures <br /> ( 1 ) A test fails when the test results do not meet the Menidia beryllina limits in <br /> ( 2) Additional Follow-up Tests : <br /> ( a) If a routine test does not meet the acute toxicity limitation in 9 . a. ( 1 ) above, <br /> the Respondent shall notify the Department at the address above within 21 days after the last day of <br /> the failed routine test and conduct two additional follow -up tests on Menidia beryllina in <br /> accordance with 9 . d . <br /> (b) The first test shall be initiated within 28 days after the last day of the failed <br /> routine test . The remaining additional follow-up tests shall be conducted weekly thereafter until a <br /> total of two valid additional follow -up tests are completed . <br /> (c) The first additional follow-up test shall be conducted using a control (0% <br /> effluent) and a minimum of five dilutions : 100°/x , 50% , 25 % , 12 . 5 % , and 6 . 25 % effluent . The <br /> Respondent may modify the dilution series in the second additional follow -up test to more <br /> accurately bracket the toxicity such that at least two dilutions above and two dilutions below the <br /> target concentration and a control (0% effluent) are run . All test results shall be statistically <br /> analyzed according to the Appendices in EPA - 821 -R-02-012 . <br /> ( 3 ) In the event of three valid Menidia beryllina test failures (whether routine or <br /> additional follow-up tests) within a 12 -month period, the Respondent shall notify the Department <br /> within 21 days after the last day of the third test failure. <br /> ( a) The Respondent shall submit a plan for correction of the effluent toxicity <br /> within 60 days after the last day of the third test failure . <br /> 9 of 17 OGC File No . 08 - 1661 <br />
The URL can be used to link to this page
Your browser does not support the video tag.