My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-287
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 11:54:18 AM
Creation date
10/1/2015 12:36:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
09/09/2008
Control Number
2008-287
Agenda Item Number
12.J.1
Entity Name
Florida Department of Environmental Protection
Subject
Consent Order South Reverse Osmosis Water Treatment Plant
Discharge Monitoring Reports
Area
South Reverse Osmosis Water Treatment Plant
Project Number
OGC 08-1661
Supplemental fields
SmeadsoftID
7570
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3 ) If 100% mortality occurs in all effluent concentrations prior to the end of any <br /> test and the control mortality is less than 10% at that time , the test ( including the control) shall be <br /> terminated with the conclusion that the test fails and constitutes non-compliance . <br /> f. Reporting Requirements : <br /> ( 1 ) Results from all required tests shall be reported on the Discharge Monitoring <br /> Report (DMR) as follows : <br /> (a) The calculated LC50 effluent concentration shall be entered on the DMR for <br /> each test species . <br /> (2) A bioassay laboratory report for each bioassay test shall be prepared <br /> according to EPA- 821 -R-02 -012 , Section 12 , Report Preparation and Test Review, and mailed to <br /> the Department at the address in below within 30 days after the last day of the test. <br /> (3 ) Data for invalid tests shall be included in the bioassay laboratory report for <br /> the repeat test. <br /> (4) The same bioassay data shall not be reported as the results of more than one <br /> test . <br /> ( 5 ) The permittee will notify the Department when the MSIIT testing is begun. <br /> Results of the MSIIT testing shall be mailed to the Department at the address below within 30 days <br /> following the last day of the MSIIT testing . <br /> (6) Within 60 days following completion of the MSIIT testing, the permittee <br /> shall contact the Department to discuss the finding of the MSIIT testing any additional toxicity <br /> identification studies or actions required to remedy the observed acute toxicity . <br /> (7) All bioassay laboratory reports and chemical analysis results shall be sent to : <br /> Florida Department of Environmental Protection <br /> Central District Office <br /> 8 of 17 OGC File No . 08- 1661 <br />
The URL can be used to link to this page
Your browser does not support the video tag.