My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-313a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-313a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:25:31 PM
Creation date
9/30/2015 9:07:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2005
Control Number
2005-313A
Agenda Item Number
11.I.
Entity Name
Ranger Construction Industries
Subject
Intersection improvements/part 2
Sidewalk & Drainage improvements
Area
41st. St. widening Dodgertown Elementary
Supplemental fields
SmeadsoftID
5167
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rr <br /> 4 . Product : All materials shall be new and unused . The length of the <br /> curb inlet filtration device shall be at least 2 -feet longer than the <br /> curb inlet opening . <br /> a . "GUTTERBUDDY , " supplied by ACF Environmental , Inc . ( 1 - <br /> 800-448-3636 ) . <br /> b . Or equivalent . <br /> E . Catch Basin Protection : <br /> ,. 1 . Filter stormwater before it enters catch basins (drop inlets ) . The <br /> "sack" shall be manufactured from woven polypropylene geotextile <br /> and sewn by a double- needle machine , using a high strength nylon <br /> .. thread . The sack shall be manufactured to fit the opening of the <br /> catch basin or drop inlet and it shall have the following features : two <br /> dump straps attached at the bottom to facilitate emptying ; lifting <br /> .. loops as an integral part of the system to be used to lift the sack <br /> from the basin ; and a yellow restraint chord approximately halfway <br /> up the sack to keep the sides away from the catch basin walls . The <br /> aw yellow restraint chord shall also serve as a visual means of <br /> indicating when the sack should be emptied . <br /> 2 . Installation : Install in each catch basin in accordance with the <br /> manufacturer' s specifications . Use as many of the specified <br /> filtration devices as required , at no additional cost to the OWNER . <br /> 3 . Removal : The Contractor will be responsible for removal of all <br /> filtration devices . <br /> 4 . Product: All materials shall be new and unused . <br /> a . "SILTSACK" ( regular flow) , supplied by ACF Environmental , <br /> Inc . ( 1 -800-448-3636 ) . <br /> b . " FloGuard + PLUS , " supplied by Kristar Enterprises , Inc . <br /> ( 1 -800-579-8819 ) . <br /> C , Or equivalent . <br /> F . Construction Site Egress Driveways: Minimize the transport of sediment <br /> and soil from the construction site or work area by vehicle wheels . <br /> Construct a crushed rock driving surface at the vehicle exit point(s ) . <br /> Provide an area large enough to remove the sediment and soil from <br /> vehicle wheels before the vehicle leaves the construction site or work <br /> area . Provide wash -down stations as required to wash vehicle tires and <br /> retain all washwater on-site . <br /> G . Rock and Stone for Erosion Control and Pollution Control and Treatment : <br /> 1 . Crushed Limerock: Crushed limerock shall not be used under any <br /> circumstance . <br /> 2 . Acceptable Material : FDOT #4 non -calcareous aggregate ( usually <br />.. granite ) , washed and meeting the requirements of FDOT Standard <br /> Specifications for Road and Bridge Construction , Section 901 . <br /> A„ H . Hay Bales : Hay bales shall not be used . <br /> TECHNICIAL PROVISION <br /> TP -8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.