Laserfiche WebLink
PART 3 EXECUTION <br /> A . Design , construct , and maintain the pollution control and treatment system <br /> to minimize erosion and capture and remove pollutants from the <br /> construction site and from all other areas disturbed by construction <br /> activities . <br /> PART 4 COMPENSATION <br /> A . All payment for the above items shall be made under: <br /> Item No . 3 — Erosion & Turbidity Control — Lump Sum <br /> [The remainder of this page was left blank intentionally] <br /> TECHNICIAL PROVISION <br /> TP -9 <br /> • <br />