Laserfiche WebLink
50 . CONCRETE ( RETAINING WALL ) <br /> A . The work specified in this item shall conform to Section 548 of the Florida <br /> V Department of Transportation Standard Specifications for Road and <br /> Bridge Construction (2002 ) . <br /> Be Payment shall be made under: <br /> Item No . 50 — Class Concrete ( Retaining Wall ) — Per Cubic Yard <br /> 52 , CONCRETE CURB AND GUTTER <br /> A . The work specified in this item shall conform to Section 520 of the Florida <br /> • Department of Transportation Standard Specifications for Road and <br /> Bridge Construction ( Latest Edition ) . <br /> Be Payment shall be made under: <br /> Item No . 52 — Concrete Curb & Gutter — Per Linear Foot <br /> 53 , CONCRETE SIDEWALK <br /> A . The work specified in this item shall conform to Section 522 of the Florida <br /> • Department of Transportation Standard Specifications for Road and <br /> Bridge Construction ( Latest Edition ) . <br /> Be Payment shall be made under: <br /> Item No . 53 — Concrete Sidewalk — Per Square Yard <br /> • 54 . SODDING <br /> A . Description : Sod for the project shall be of the variety that is common to <br /> AW the area and of a variety approved by the Engineer. Where sodding an <br /> area in which previously had established grass the new sod shall be of the <br /> same variety as existing (Argentina Bahia or St . Augustine ) . This work <br />.. shall also include mowing in accordance with Section 104-7 . 2 ( Page 129 ) , <br /> to be mowed at 6 " height with a mulching mower. <br /> Be Work Included : Scope of Work : The work specified in this section consists <br /> of the establishing of a stand of grass , within the project, right-of-way, <br /> easements , and other areas indicated on the Drawings , by furnishing and <br /> placing grass sod . Also included are fertilizing , watering and maintenance <br /> as required to assure a healthy stand of grass . Two applications of <br /> fertilizer will be required with the initial application being fertilizer and the <br /> second application being "weed and feed " . <br /> C . Guarantee : All sodded areas shall be guaranteed for three months after <br /> date of final acceptance . <br /> Replacement of Defective Sod : Any dead sod or sod showing (less than <br /> 95 % of a square ) indication of probable non survival or lack of health and <br /> vigor, or which do not exhibit the characteristics to meet specifications , <br /> TECHNICIAL PROVISION <br /> TP - 16 <br />