My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-313a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-313a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:25:31 PM
Creation date
9/30/2015 9:07:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2005
Control Number
2005-313A
Agenda Item Number
11.I.
Entity Name
Ranger Construction Industries
Subject
Intersection improvements/part 2
Sidewalk & Drainage improvements
Area
41st. St. widening Dodgertown Elementary
Supplemental fields
SmeadsoftID
5167
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
During construction , the Contractor is to maintain the storm sewer void of ` <br /> any silting material . Prior to final acceptance the Contractor or Engineer <br /> shall inspect and certify that the storm sewer is free of any construction <br /> material or debris and operates in a functional manner. Contractor shall <br /> remove silt and other material from sewer at no cost to Owner. <br /> Payment shall be made under: ` <br /> Item No . 25 - Concrete Pipe Culvert ( 12 " x 18" ) - Per Linear Foot <br /> Item No . 26 - Concrete Pipe Culvert ( 12 " ) - Per Linear Foot <br /> Item No . 27 - Concrete Pipe Culvert ( 15" ) - Per Linear Foot <br /> Item No . 28 - Concrete Pipe Culvert ( 18 " ) - Per Linear Foot <br /> Item No . 29 - Concrete Pipe Culvert (24" ) - Per Linear Foot <br /> Item No . 30 - Concrete Pipe Culvert (30" ) - Per Linear Foot <br /> Item No . 31 - Concrete Pipe Culvert (36" ) Per Linear Foot <br /> Item No . 35 - Mitered End Section ( 12 " x 18" Pipe ) - Per Each <br /> Item No . 36 - Mitered End Section ( 18" Pipe ) - Per Each <br /> Item No . 37 - Mitered End Section (24" Pipe ) - Per Each <br /> 38 . UNDERDRAIN <br /> This pay item includes all materials , labor, excavation , backfilling , w. <br /> aggregate , filter fabric , tamping and disposal of all surplus materials for <br /> the installation of 4 " diameter underdrain , as shown on the plans . <br /> Payment shall be made under: <br /> Item No . 38 — Underdrain - Per Linear Foot <br /> 39 . BITUMINUS COATED CORRUGATED METAL <br /> The work specified in this item shall conform to Section 430 , 443 , 944 of <br /> the Florida Department of Transportation Standard Specifications for Road ` <br /> and Bridge Construction ( Latest Edition ) . <br /> Payment shall be made under: <br /> Item No . 39 — 15" BCCMP - Per Linear Foot <br /> Item No . 40 — 18" BCCMP — Per Linear Foot r• <br /> Item No . 41 — 18 " Perforated BCCMP — Per Linear Foot <br /> Item No . 42 — 24 " BCCMP — Per Linear Foot <br /> Item No . 43 — 24 " Perforated BCCMP — Per Linear Foot <br /> Item No . 44 — 36" BCCMP — Per Linear Foot <br /> Item No . 45 — Flashboard Risers (24" ) — Per Each <br /> Item No . 46 — Flashboard Risers (36" ) — Per Each <br /> 47 . CONCRETE ( ENDWALLS ) <br /> Payment shall be made under: <br /> Item No . 47 —Concrete ( Endwalls ) - Per Each Size Pipe 18 x 76 " RCP <br /> Item No . 48 —Concrete ( Endwalls ) - Per Each Size Pipe 24 " x 76 " RCP <br /> Item No . 49 —Concrete ( Endwalls ) - Per Each Size Pipe 48 " x 76" RCP <br /> TECHNICIAL PROVISION <br /> TP - 15 <br /> rr <br />
The URL can be used to link to this page
Your browser does not support the video tag.