<br /> extent caused by or based upon
<br /> `� CONTRACTOR's performance of the Work . 3 , other property at the Site or adjacent
<br /> thereto, including trees , shrubs , lawns , walks ,
<br /> B . Removal of Debris During Performance of the pavements , roadways , structures , utilities , and
<br /> +. Work: During the progress of the Work CONTRAC- Underground Facilities not designated for
<br /> TOR shall keep the Site and other areas free from removal , relocation , or replacement in the
<br /> accumulations of waste materials , rubbish , and other course of construction .
<br /> debris . Removal and disposal of such waste materi-
<br /> als , rubbish , and other debris shall conform to applica- B . CONTRACTOR shall comply with all applica-
<br /> ble Laws and Regulations . ble Laws and Regulations relating to the safety of
<br /> persons or property, or to the protection of persons or
<br /> .. C . Cleaning: Prior to Substantial Completion of property from damage, injury, or loss; and shall erect
<br /> the Work CONTRACTOR shall clean the Site and and maintain all necessary safeguards for such safety
<br /> make it ready for utilization by OWNER. At the com - and protection . CONTRACTOR shall notify owners of
<br /> pletion of the Work CONTRACTOR shall remove from adjacent property and of Underground Facilities and
<br /> the Site all tools , appliances , construction equipment other utility owners when prosecution of the Work may
<br /> and machinery, and surplus materials and shall affect them , and shall cooperate with them in the
<br /> restore to original condition all property not designated protection , removal , relocation , and replacement of
<br /> for alteration by the Contract Documents . their property. All damage , injury, or loss to any
<br /> property referred to in paragraph 6 . 13 .A.2 or 6 . 13 .A.3
<br /> D. Loading Structures: CONTRACTOR shall not caused , directly or indirectly, in whole or in part, by
<br /> load nor permit any part of any structure to be loaded CONTRACTOR, any Subcontractor, Supplier, or any
<br /> in any manner that will endanger the structure, nor other individual or entity directly or indirectly employed
<br /> shall CONTRACTOR subject any part of the Work or by any of them to perform any of the Work, or anyone
<br /> adjacent property to stresses or pressures that will for whose acts any of them may be liable, shall
<br /> be
<br /> endanger it. remedied by CONTRACTOR (except damage or loss
<br /> attributable to the fault of Drawings or Specifications
<br /> 6 . 12 Record Documents or to the acts or omissions of OWNER or ENGINEER
<br /> or ENGINEER's Consultant, or anyone employed by
<br /> �r A. CONTRACTOR shall maintain in a safe place any of them , or anyone for whose acts any of them
<br /> at the Site one record copy of all Drawings , Specifica- may be liable, and not attributable, directly or
<br /> tions , Addenda , Written Amendments , Change indirectly, in whole or in part, to the fault or negligence
<br /> .r Orders , Work Change Directives , Field Orders , and of CONTRACTOR or any Subcontractor, Supplier, or
<br /> written interpretations and clarifications in good order other individual or entity directly or indirectly employed
<br /> and annotated to show changes made during by any of them ) . CONTRACTOR's duties and
<br /> construction . These record documents together with responsibilities for safety and for protection of the
<br /> wr all approved Samples and a counterpart of all Work shall continue until such time as all the Work is
<br /> approved Shop Drawings will be available to ENGI- completed and ENGINEER has issued a notice to
<br /> NEER for reference . Upon completion of the Work, OWNER and CONTRACTOR in accordance with
<br /> these record documents , Samples , and Shop paragraph 14 . 07 . 13 that the Work is acceptable
<br /> .. Drawings will be delivered to ENGINEER for OWNER. (except as otherwise expressly provided in connection
<br /> with Substantial Completion ) .
<br /> 6 . 13 Safety and Protection
<br /> ,., 6 . 14 Safety Representative
<br /> A. CONTRACTOR shall be solely responsible
<br /> for initiating , maintaining and supervising all safety A. CONTRACTOR shall designate a qualified
<br /> precautions and programs in connection with the and experienced safety representative at the Site
<br /> Work. CONTRACTOR shall take all necessary whose duties and responsibilities shall be the
<br /> precautions for the safety of, and shall provide the prevention of accidents and the maintaining and
<br /> necessary protection to prevent damage, injury or loss supervising of safety precautions and programs .
<br /> .■ to :
<br /> 6 . 15 Hazard Communication Programs
<br /> 1 . all persons on the Site or who may
<br /> be affected by the Work ; A. CONTRACTOR shall be responsible for
<br /> coordinating any exchange of material safety data
<br /> 2 . all the Work and materials and equip- sheets or other hazard communication information
<br /> ment to be incorporated therein , whether in required to be made available to or exchanged be-
<br /> storage on or off the Site ; and
<br /> 0016-00700 - General Conditions