Laserfiche WebLink
4W <br /> extent caused by or based upon <br /> `� CONTRACTOR's performance of the Work . 3 , other property at the Site or adjacent <br /> thereto, including trees , shrubs , lawns , walks , <br /> B . Removal of Debris During Performance of the pavements , roadways , structures , utilities , and <br /> +. Work: During the progress of the Work CONTRAC- Underground Facilities not designated for <br /> TOR shall keep the Site and other areas free from removal , relocation , or replacement in the <br /> accumulations of waste materials , rubbish , and other course of construction . <br /> debris . Removal and disposal of such waste materi- <br /> als , rubbish , and other debris shall conform to applica- B . CONTRACTOR shall comply with all applica- <br /> ble Laws and Regulations . ble Laws and Regulations relating to the safety of <br /> persons or property, or to the protection of persons or <br /> .. C . Cleaning: Prior to Substantial Completion of property from damage, injury, or loss; and shall erect <br /> the Work CONTRACTOR shall clean the Site and and maintain all necessary safeguards for such safety <br /> make it ready for utilization by OWNER. At the com - and protection . CONTRACTOR shall notify owners of <br /> pletion of the Work CONTRACTOR shall remove from adjacent property and of Underground Facilities and <br /> the Site all tools , appliances , construction equipment other utility owners when prosecution of the Work may <br /> and machinery, and surplus materials and shall affect them , and shall cooperate with them in the <br /> restore to original condition all property not designated protection , removal , relocation , and replacement of <br /> for alteration by the Contract Documents . their property. All damage , injury, or loss to any <br /> property referred to in paragraph 6 . 13 .A.2 or 6 . 13 .A.3 <br /> D. Loading Structures: CONTRACTOR shall not caused , directly or indirectly, in whole or in part, by <br /> load nor permit any part of any structure to be loaded CONTRACTOR, any Subcontractor, Supplier, or any <br /> in any manner that will endanger the structure, nor other individual or entity directly or indirectly employed <br /> shall CONTRACTOR subject any part of the Work or by any of them to perform any of the Work, or anyone <br /> adjacent property to stresses or pressures that will for whose acts any of them may be liable, shall <br /> be <br /> endanger it. remedied by CONTRACTOR (except damage or loss <br /> attributable to the fault of Drawings or Specifications <br /> 6 . 12 Record Documents or to the acts or omissions of OWNER or ENGINEER <br /> or ENGINEER's Consultant, or anyone employed by <br /> �r A. CONTRACTOR shall maintain in a safe place any of them , or anyone for whose acts any of them <br /> at the Site one record copy of all Drawings , Specifica- may be liable, and not attributable, directly or <br /> tions , Addenda , Written Amendments , Change indirectly, in whole or in part, to the fault or negligence <br /> .r Orders , Work Change Directives , Field Orders , and of CONTRACTOR or any Subcontractor, Supplier, or <br /> written interpretations and clarifications in good order other individual or entity directly or indirectly employed <br /> and annotated to show changes made during by any of them ) . CONTRACTOR's duties and <br /> construction . These record documents together with responsibilities for safety and for protection of the <br /> wr all approved Samples and a counterpart of all Work shall continue until such time as all the Work is <br /> approved Shop Drawings will be available to ENGI- completed and ENGINEER has issued a notice to <br /> NEER for reference . Upon completion of the Work, OWNER and CONTRACTOR in accordance with <br /> these record documents , Samples , and Shop paragraph 14 . 07 . 13 that the Work is acceptable <br /> .. Drawings will be delivered to ENGINEER for OWNER. (except as otherwise expressly provided in connection <br /> with Substantial Completion ) . <br /> 6 . 13 Safety and Protection <br /> ,., 6 . 14 Safety Representative <br /> A. CONTRACTOR shall be solely responsible <br /> for initiating , maintaining and supervising all safety A. CONTRACTOR shall designate a qualified <br /> precautions and programs in connection with the and experienced safety representative at the Site <br /> Work. CONTRACTOR shall take all necessary whose duties and responsibilities shall be the <br /> precautions for the safety of, and shall provide the prevention of accidents and the maintaining and <br /> necessary protection to prevent damage, injury or loss supervising of safety precautions and programs . <br /> .■ to : <br /> 6 . 15 Hazard Communication Programs <br /> 1 . all persons on the Site or who may <br /> be affected by the Work ; A. CONTRACTOR shall be responsible for <br /> coordinating any exchange of material safety data <br /> 2 . all the Work and materials and equip- sheets or other hazard communication information <br /> ment to be incorporated therein , whether in required to be made available to or exchanged be- <br /> storage on or off the Site ; and <br /> 0016-00700 - General Conditions <br /> Page 23 of 44 <br /> F:\Engineering\Capital Projects\0016 & 0236- 41 st Street Improvements\0016 & 0236-41 st St Contract Docs\0016-00700 - General Conditions.doc <br /> rlll <br />