My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-313a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-313a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:25:31 PM
Creation date
9/30/2015 9:07:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2005
Control Number
2005-313A
Agenda Item Number
11.I.
Entity Name
Ranger Construction Industries
Subject
Intersection improvements/part 2
Sidewalk & Drainage improvements
Area
41st. St. widening Dodgertown Elementary
Supplemental fields
SmeadsoftID
5167
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41r <br /> believes to be ready for its intended use and tees , Bonds , certificates or other evidence of <br /> "r substantially complete . If CONTRACTOR insurance certificates of inspection , marked-up <br /> agrees that such part of the Work is record documents (as provided in paragraph <br /> substantially complete , CONTRACTOR will 6 . 12 ), and other documents , CONTRACTOR <br /> 4r certify to OWNER and ENGINEER that such may make application for final payment follow- <br /> part of the Work is substantially complete and ing the procedure for progress payments . <br /> request ENGINEER to issue a certificate of <br /> Substantial Completion for that part of the 2 . The final Application for Payment <br /> " Work . CONTRACTOR at any time may notify shall be accompanied (except as previously <br /> OWNER and ENGINEER in writing that delivered ) by: (i) all documentation called for in <br /> CONTRACTOR considers any such part of the the Contract Documents , including but not <br /> ,,. Work ready for its intended use and substan- limited to the evidence of insurance required by <br /> tially complete and request ENGINEER to issue subparagraph 5 .04 . 13 . 7 ; (ii) consent of the <br /> a certificate of Substantial Completion for that surety, if any, to final payment; and (iii ) <br /> part of the Work . Within a reasonable time complete and legally effective releases or <br /> after either such request, OWNER, waivers (satisfactory to OWNER) of all Lien <br /> CONTRACTOR, and ENGINEER shall make rights arising out of or Liens filed in connection <br /> an inspection of that part of the Work to with the Work. <br /> determine its status of completion . If <br /> ENGINEER does not consider that part of the 3 . In lieu of the releases or waivers of <br /> Work to be substantially complete, ENGINEER Liens specified in paragraph 14 .07 .A.2 and as <br /> will notify OWNER and CONTRACTOR in approved by OWNER, CONTRACTOR may <br /> writing giving the reasons therefor. If furnish receipts or releases in full and an <br /> ENGINEER considers that part of the Work to affidavit of CONTRACTOR that: (i) the releases <br /> be substantially complete, the provisions of and receipts include all labor, services , <br /> ,W paragraph 14 . 04 will apply with respect to material , and equipment for which a Lien could <br /> certification of Substantial Completion of that be filed ; and (ii) all payrolls , material and <br /> part of the Work and the division of equipment bills , and other indebtedness <br /> responsibility in respect thereof and access connected with the Work for which OWNER or <br /> +� thereto. OWNER's property might in any way be <br /> responsible have been paid or otherwise satis- <br /> 2 . No occupancy or separate operation fied . If any Subcontractor or Supplier fails to <br /> of part of the Work may occur prior to furnish such a release or receipt in full , CON- <br /> compliance with the requirements of paragraph TRACTOR may furnish a Bond or other <br /> 5 . 10 regarding property insurance . collateral satisfactory to OWNER to indemnify <br /> OWNER against any Lien . <br /> .. 14 . 06 Final Inspection <br /> B . Review of Application and Acceptance <br /> A. Upon written notice from CONTRACTOR that <br /> the entire Work or an agreed portion thereof is 1 . If, on the basis of ENGINEER's <br /> complete , ENGINEER will promptly make a final observation of the Work during construction <br /> inspection with OWNER and CONTRACTOR and will and final inspection , and ENGINEER's review <br /> notify CONTRACTOR in writing of all particulars in of the final Application for Payment and <br /> .r which this inspection reveals that the Work is accompanying documentation as required by <br /> incomplete or defective . CONTRACTOR shall the Contract Documents , ENGINEER is <br /> immediately take such measures as are necessary to satisfied that the Work has been completed <br /> complete such Work or remedy such deficiencies . and CONTRACTOR's other obligations under <br /> the Contract Documents have been fulfilled , <br /> 14 . 07 Final Payment ENGINEER will , within ten days after receipt of <br /> the final Application for Payment, indicate in <br /> 4W A. Application for Payment writing ENGINEER's recommendation of <br /> payment and present the Application for <br /> 1 . After CONTRACTOR has , in the Payment to OWNER for payment. At the same <br /> opinion of ENGINEER, satisfactorily completed time ENGINEER will also give written notice to <br /> 40 all corrections identified during the final OWNER and CONTRACTOR that the Work is <br /> inspection and has delivered , in accordance acceptable subject to the provisions of <br /> with the Contract Documents , all maintenance paragraph 14 .09 . Otherwise , ENGINEER will <br /> 4M and operating instructions , schedules , guaran- return the Application for Payment to <br /> 0016-00700 - General Conditions <br /> Page 41 of 44 <br /> FAEngineering\Capital Projects\0016 & 0236- 41 st Street Improvements\0016 & 0236-41st St Contract Docs\0016-00700 - General Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.