My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-313a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-313a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:25:31 PM
Creation date
9/30/2015 9:07:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2005
Control Number
2005-313A
Agenda Item Number
11.I.
Entity Name
Ranger Construction Industries
Subject
Intersection improvements/part 2
Sidewalk & Drainage improvements
Area
41st. St. widening Dodgertown Elementary
Supplemental fields
SmeadsoftID
5167
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wr <br /> G . It is the intent of the Specifications to place the responsibility on the <br /> CONTRACTOR to restore to their original condition all items disturbed , <br /> destroyed , or damaged during construction . Particular attention will be <br /> placed on restoration of canals to equal or better condition than prior to <br /> construction . <br /> H . When finished surfaces require cleaning with cleaning materials , use only <br /> those cleaning materials which will not create hazards to health or <br /> , property and which will not damage the surfaces . Use cleaning materials <br /> .. only on those surfaces recommended by the manufacturer. Follow the <br /> manufacturer' s directions and recommendations at all times . <br /> .. I . Keep the amount of dust produced during construction activities to a <br /> minimum . At CONTRACTOR' s expense , spray water or other dust control <br /> agents over the areas , which are producing the dust . Schedule <br /> .. construction operations so that dust and other contaminants will not fall on <br /> wet or newly coated surfaces . <br /> 1 . 3 SITE CLEANUP AND RESTORATION <br /> Prior to final completion , the OWNER , ENGINEER , INDIAN RIVER FARMS <br /> WATER CONTROL DISTRICT , and CONTRACTOR shall review the site with <br /> regards to site cleanup and restoration . Clean and/or restore all items <br /> determined to be unsatisfactory by the OWNER or ENGINEER , at no additional <br /> expense . <br /> + + END OF SECTION + + <br /> 01710 Site Cleanup <br /> 01710-2 <br /> wr FAEngineering\Capital Projects\0016 & 0236- 41st Street Improvements\0016 & 0236-41st St Contract Docs\0016-01710 - Site Cleanup.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.