My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-156b
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-156b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 12:43:31 PM
Creation date
9/30/2015 8:43:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/10/2005
Control Number
2005-156B
Agenda Item Number
7.O.
Entity Name
Gibbflin, L.L.C.
Flinchum Construction
Subject
Contract Required Sidewalk Improvements
Gibbflin Medical Subdivision
Supplemental fields
SmeadsoftID
4900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GIBBFLIN MEDICAL SUBDIVISION <br /> 8 " PVC Sewer LF 918 $31 . 00 $28 ,458 . 00 10 $28 ,458 . 00 <br /> Sewer Manhole 6 $25300 . 00 $ 3,8 100 .00% $ 13 , 800 . 00 <br /> Single Lateral EA $ 19500 .00 100 . 00% $ 1 ,500 . 00 � � <br /> Double Lateral EA $5 $ 500 . 00 100 . 00% $ 500 . 00 <br /> Directional Bore S 1 $ 109000 . 00 $ 10,0 100 . 00% $ 10,000 . 00 - Z <br /> TV Camera n LS 1 $5 , 000 .00 $ 5 , 000 . 00 100 . 0 0 000 . 00 <br /> ubtota�l -S59,258.00-i 0:00%-$593 <br /> MISCELLANEOUS <br /> 4 " Thick Sidewalk SF 7000 $3 . 50 $249500 . 00 100 . 00% $247500 . 00 <br /> SF 2i220 $0 . 18Q � 810 60 190:98%- t�lw <br /> -m�,vr.��v Z$ 12 . 000 . 00 Subtotal $28,319.60 100. <br /> SURVEY <br /> Stake-out LS 1 $ 10,000 . 00 $ 10, 000 . 00 100 . <br /> Monuments (Lots CP's) LS 1 $ 15500 .00 $ 1 ,500 .00 100 . / <br /> As-builts LS 1 $ 12,000 .00 $ 129000 .00 100. <br /> Subtotal $239500. 00 0 . 00% $23,500. 00 <br /> LANDSCAPINGA RRIGATIO Note : All trees to be planted with individu to plans . <br /> Bahia Sod SF 10840 $0 . 18 $ 199 .20 100 .00% $ 15951 .20 Apt <br /> Irrigation S 1 $3 ,000 . 00 1000 . 00 100 . 00% $ 3 ,000 . 00 <br /> Seed & Mulch L 1 $ 15500 . 00 $ 1 , 500 . 00 100 . 00% $ 13500 . 00 <br /> Subtotal $69451 .20 100 . 00% $69451 .20 <br /> ENGINEERING <br /> Inspections LS 1 5000 . 00 $3 ,000 . 00 100 . 00% $33000 . 00 <br /> Certification LS 1 9000 . 00 $ 17000 . 00 100.00% $ 1 ,000 . 00 <br /> Subto $4,000. 00 100 .00% $4,000. 00 <br /> TOTAL CONSTRUCTION COSTS <br /> EARTHWORK & GRADING $479550.00 100 . 00% $479550.00 <br /> ROADWAY/RIGHT-OF-WAY 7,359.75 100 .00% $77,359.75 <br /> DRAINAGE $97 32.00 100. 00% $97,332.00 <br /> WATER $29,68 . 0 100 . 00% $299680. 00 <br /> SEWER $599258. 00 100 . 00% $599258.00 <br /> MISCELLANEOUS $28,319.60 00 .00% $289319.60 <br /> SURVEY $239500.00 1 00% $23,500.00 <br /> LANDSCAPING GATION $6,451 .20 100 . 0 0 $69451 .20 <br /> ENGINEE $49000. 00 100 . 00% $49000. 00 <br /> TOTAL $3739450.55 100.00% 739450.55 <br /> P $569017.58 $5690 58 <br /> 429;468:1 <br /> Date &Z Y j U 6 <br /> Joda Bittle, 'P .E. . . Reg No . 57396 ^J f Je Loa � k <br /> OO <br /> -� bus 15 % <br /> _ ? Ec Pr fE <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.