§ 3.3. 3 The Contractor shall be responsible for inspection of portions of Work already performed to determine that
<br /> such portions are in proper condition to receive subsequent Work.
<br /> § 3.4 LABOR AND MATERIALS
<br /> § 3 .4. 1 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor,
<br /> materials, equipment, tools , construction equipment and machinery, water, heat, utilities , transportation, and other
<br /> facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent
<br /> and whether or not incorporated or to be incorporated in the Work .
<br /> § 3 .4.2 The Contractor may make substitutions only with the consent of the Owner, after evaluation by the Architect
<br /> and in accordance with a Change Order.
<br /> § 3.4. 3 The Contractor shall enforce strict discipline and good order among the Contractor ' s employees and all other
<br /> persons carrying out the C-entraet-Contract at the work site . The Contractor shall not permit employment of unfit
<br /> persons or persons not skilled in tasks assigned to them.
<br /> § 3.5 WARRANTY
<br /> § 3.5. 1 The Contractor warrants to the Owner and Architect that materials and equipment furnished under the
<br /> Contract will be of good quality and new unless otherwise required or permitted by the Contract Documents, that the
<br /> Work will be free from defects not inherent in the quality required or permitted, and that the Work will conform to
<br /> the requirements of the Contract Documents. Work not conforming to these requirements, including substitutions
<br /> not properly approved and authorized, may-will be considered defective . The Contractor' s warranty excludes
<br /> remedy for damage or defect caused by abuse, modifications not executed by the Contractor, improper or
<br /> insufficient maintenance, improper operation, or normal wear and tear and normal usage . If required by the
<br /> Architect or the Architeet Owner, the Contractor shall furnish satisfactory evidence as to the kind and quality of
<br /> materials and equipment.
<br /> § 3.6 TAXES
<br /> § 3.6. 1 The Contractor shall pay sales, consumer, use and similar taxes for the Work provided by the Contractor
<br /> which are legally enacted when bids are received or negotiations concluded, whether or not yet effective or merely
<br /> scheduled to go into effect.
<br /> § 3.7 PERMITS, FEES AND NOTICES
<br /> § 3.7. 1 Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building
<br /> permit and other permits and governmental fees, licenses and inspections necessary for proper execution and
<br /> completion of the Work which are customarily secured after execution of the Contract and which are legally
<br /> required when bids are received or negotiations concluded . Contractor acknowledges that the foregoing items are
<br /> governed by the provisions of Florida Statutes section 218 . 80, Public Bid Disclosure Act.
<br /> § 3.7.2 The Contractor shall comply with and give notices required by laws, ordinances, rules, regulations and lawful
<br /> orders of public authorities applicable to performance of the Work.
<br /> § 3.7.3 It is not the Contractor ' s responsibility to ascertain that the Contract Documents are in accordance with
<br /> applicable laws, statutes, ordinances, building codes, and rules and regulations. However, if the Contractor observes
<br /> that portions of the Contract Documents are at variance therewith, the Contractor shall promptly notify the Architect
<br /> and Owner in writing, and necessary changes shall be accomplished by appropriate Modification.
<br /> § 3.7.4 If the Contractor performs Work knowing it to be contrary to laws, statutes, ordinances, building codes , and
<br /> rules and regulations without such notice to the Architect and Owner, the Contractor shall assume appropriate
<br /> responsibility for correction of such Work and shall bear the costs of losses and expenses attributable to correction .
<br /> § 3.8 ALLOWANCES
<br /> § 3 .8. 1 The Contractor shall include in the Contract Sum all allowances stated in the Contract Documents. Items
<br /> covered by allowances shall be supplied for such amounts and by such persons or entities as the Owner may direct,
<br /> AIA Document A201TM — 1997. Copyright ® 1911 , 1915, 1918, 1925, 1937, 1951 , 1958, 1961 , 1963, 1966, 1967, 1970 , 1976, 1987 and 1997
<br /> by The
<br /> American Institute of Architects. All rights reserved. WARNING : This AIA* Document is protected by U.S. Copyright Law and International Treaties.
<br /> 4
<br /> Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result In severe civil and criminal penalties, and will
<br /> be
<br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 17 : 14:54 on 05/25/2005 under Order
<br /> No. 1000126313_1 which expires on 6/29/2005, and is not for resale.
<br /> User Notes: (3418817618)
<br />
|