Laserfiche WebLink
WORK DIRECTIVE CHANGE <br /> (Instructions on reverse side) <br /> PROJECT : DATE OF ISSUANCE : <br /> 1%W OWNER : ' <br /> (Name , <br /> Address) <br /> CONTRACTOR . OWNER' s Project No . <br /> ENGINEER : <br /> CONTRACT EOR : ENGINEER' s Project No. <br /> You are directed to proceed promptly with the following change(s) : <br /> Description : <br /> Purpose of Work Directive Change : <br /> Attachments : (list documents supporting change) <br /> Lf a claim is made that the above change ( s) have affected Contract Price or Contract Time , <br /> any claim for a Change Order based thereon will involve one of the following methods of <br /> determining the effect of the change (s) . <br /> Method of determining change in Method of determining change in <br /> Contract Price : Contract Time <br /> ❑ Time and materials ❑ Contractor' s records <br /> Unit prices C1 Engineer' s records <br /> Cost plus fined fee ❑ Other - <br /> ❑ Other <br /> Estimated increase ( decrease) in Contract Estimated increase ( decrease) in Contract <br /> Price : S Time : _-- days . if the change <br /> If the change involves an increase , the estiy involves an increase , the estimated time is <br /> mated amount is not to be exceeded with = not to be exceeded without further autho - <br /> out further authorization . rization . <br /> RECOMMENDED : AUTHORIZED : <br /> by by o .ner <br /> E� p�eer <br /> 1%W <br /> E.JCDC No . 1910 - 8 - F ( 1983 Edition) <br /> prepared 41 the EnEineerse Joint Contract Do"ments Comtnittee and endorsed 6y the Astt+eiated Genera! Contr+e ►ors °� Mme � <br /> et <br /> 0800 X7 <br />