My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-090
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2016 10:51:08 AM
Creation date
9/30/2015 8:31:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/15/2005
Control Number
2005-090
Agenda Item Number
11.J.2
Entity Name
Danella Companies, Inc.
Subject
Water,Sewer & Reclaim Water Line Replacement/ Labor Contract
Bid Number
7033
Archived Roll/Disk#
4001
Supplemental fields
SmeadsoftID
4826
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTRUCTIONS <br /> A . GENERAL INFORMATION <br /> This document was developed for use in situations invblving changes in the Work which , <br /> if not processed expeditiously , might delay the Project . These changes are often initiated <br /> in the field and may affect the Contract Price or the Contract Time . This is not a' Change <br /> Order , but only a directive to proceed with Work that may be included in a subsequent <br /> Change Order . <br /> For supplemental instructions and minor changes not involving a change in the Contract <br /> Price or the Contract Time , a Field Order may be used . <br /> B . COMPLETING THE WORK DIRECTIVE CHANGE FORM <br /> Engineer initiates the form , including a description of the items involved and attachments . <br /> Based on conversations between Engineer and Contractor , Engineer completes the fol- <br /> lowing : <br /> METHOD OF DETERMINING CHANGE , IF ANY , IN CONTRACT PRICE : Mark <br /> the method to be used in determirung the final cost of Work involved and the net <br /> effect on the Contract Price . If the change involves an increase in the Contract Price <br /> and the estimated amount is approached before the additional or changed Work is <br /> completed , another Work Directive Change must be issued to change the time or <br /> Contractor may stop the changed Work when the estimated time is reached . If the <br /> Work Directive Change is not likely to change the Contract Time , the space for <br /> estimated increase (decrease) should be marked " Not Applicable " . <br /> METHOD OF DETERMINING CHANGE , IF ANY , IN CONTRACT TIME : Mark <br /> the method to be used in determining the change in Contract Time and the estimated <br /> increase or decrease in Contract Time . If the change involves an increase in the <br /> Contract Time and the estimated time is approached before the additional or changed <br /> Work is completed , another Work Directive Change must be issued to change the <br /> time or Contractor may stop the changed Work when tha. estimated time is reached . <br /> If the Work Directive Change is not likely to change the Contract Time , the space <br /> for estimated increase ( decrease ) should be marked " Not Applicable " , <br /> Once Engineer has completed and signed the form , aU copies should be sent to Owner for <br /> authorization because Engineer alone does not have authority to authorize changes in <br /> Price or Time , Once authorized by Owner , ai copy should be sent by Engineer to Con - <br /> tractor . <br /> Once the Work covered by this directive is completed or final cost and time determined , <br /> Contractor should submit documentation for inclusion in a Change Order . <br /> THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT <br /> THE CONTRACT PRICE OR THE CONTRACT TIME . A CHANGE ORDER , IF ANY , <br /> SHOULD BE CONSIDERED PROMFrTLY . <br /> 0080048 <br />
The URL can be used to link to this page
Your browser does not support the video tag.