My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-090
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2016 10:51:08 AM
Creation date
9/30/2015 8:31:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/15/2005
Control Number
2005-090
Agenda Item Number
11.J.2
Entity Name
Danella Companies, Inc.
Subject
Water,Sewer & Reclaim Water Line Replacement/ Labor Contract
Bid Number
7033
Archived Roll/Disk#
4001
Supplemental fields
SmeadsoftID
4826
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6706- 050 <br /> 4 . Shop Drawings and Samples : <br /> a . Receive and record date of receipt of Shop Drawings and samples , <br /> receive samples which are furnished at the site by CONTRACTOR , and <br /> notify ENGINEER of their availability for examination . <br /> b . Advise ENGINEER and CONTRACTOR or his superintendent immediately <br /> of the commencement of any Work requiring a Shop Drawing or sample <br /> submission if the submission has not been approved by the ENGINEER . <br /> 5 . Review of Work , Rejection of Defective Work, Inspections and Tests : <br /> a . Conduct on - site observations of the Work in progress to assist ENGINEER <br /> in determining if the Work is proceeding in accordance with the Contract <br /> Documents and that completed Work will conform to the Contract <br /> Documents , <br /> b . Report to ENGINEER whenever he believes that any Work is <br /> unsatisfactory , faulty or defective or does not conform to the Contract <br /> Documents , or does not meet the requirements of any inspections , tests <br /> or approval required to be made or has been damaged prior to final <br /> payment ; and advise ENGINEER when he believes Work should ° be <br /> corrected or rejected or should be uncovered for observation , or requires <br /> special testing , inspection or approval , i <br /> c . Verify that tests , equipment and systems startups and operating and <br /> maintenance instructions are conducted as required by the Contract <br /> Documents and in presence of the reqdred personnel , and that <br /> CONTRACTOR maintains adequate records thereof ; observe , record and <br /> report to ENGINEER appropriate details relative to the test procedures and <br /> startups . <br /> d . Accompany visiting inspectors representing public or other agencies <br /> having jurisdiction over the Project , regard the outcome of these <br /> inspections and report to ENGINEER . <br /> 6 . Interpretation of Contract Documents : Transmit to CONTRACTOR <br /> engineer ' s clarifications and interpretations of the Contract Documents , <br /> 7 . Modifications : Consider and evaluate CONTRACTOR ' S suggestions for <br /> modifications in Drawings or Specifications and report them with <br /> recommendations to ENGINEER . <br /> 00800-28 <br /> 2/ 21196 <br />
The URL can be used to link to this page
Your browser does not support the video tag.