My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-090
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2016 10:51:08 AM
Creation date
9/30/2015 8:31:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/15/2005
Control Number
2005-090
Agenda Item Number
11.J.2
Entity Name
Danella Companies, Inc.
Subject
Water,Sewer & Reclaim Water Line Replacement/ Labor Contract
Bid Number
7033
Archived Roll/Disk#
4001
Supplemental fields
SmeadsoftID
4826
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01025 <br /> MEASUREMENT AND PAYMENT <br /> PART 1 — GENERAL <br /> 1 . 01 GENERAL <br /> Measurement and payment will be based upon work completed and accepted <br /> in accordance with the Contract Documents . No separate payment will be <br /> made for excavation , trenching dewatering , backfilling , leakage tests , <br /> surveying , density tests , or other incidental items of work not shown in the <br /> Agreement . <br /> 1 . 02 EQUIPMENT AND MATERIALS IN STORAGE <br /> The OWNER anticipates the direct purchase of most materials for this <br /> contract . <br /> 1 .03 MEASUREMENT <br /> A. Record Drawings : Measurement shall be on a lump sum basis , and shall be <br /> limited to the following maximum amounts : <br /> ORIGINAL CONTRACT AMOUNT ($) MAXIMUM AMOUNT OF <br /> FROM MORE THAN TO AND INCLUDING ITEM FOR MOBILIZATION <br /> 0 500 750 <br /> 51000 10 , 000 11000 <br /> 10 , 000 20 , 000 11500 <br /> 209000 30 , 000 21000 <br /> 30 , 000 40 , 000 21500 <br /> 40 , 000 509000 32000 <br /> 50 , 000 1007000 4 , 000 <br /> 100 , 000 200 , 000 5 , 000 <br /> Should the lump sum price bid for the item Mobilization exceed the maximum <br /> permissible amount for this item , as specified herein , the bid price will be <br /> reduced to the maximum permissible amount , and the reduced price will be <br /> used in correctly determining the total price for comparison of bids received . <br /> The cost of video taping the pre-construction condition shall be included in <br /> the lump-sum cost of mobilization . <br /> B . Pipe : Pipe will be measured along the centerline of the pipe installed . No <br /> deduction will be made for the length of valves and fittings installed in the <br /> line . Where the measurement terminates at a valve , bend , tee , or other <br /> fitting , the centerline of the valve or fitting shall be the point of termination . All <br /> 01025- 1 <br /> FAUtIIIties\UTILITY - ENGINEERING\Projects - utiiity Construction Permits\IRC - Labor Contract RE=BID for 2005- <br /> 2006\13ID DOCUMENTS - USE ONLY FOR THIS PROJ €CT\BID DOCUMENTS\01025 Measurement and Payment. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.