required pipe lining , coating , encasement material , restraining devices , and <br /> thrust blocks shall be included in the cost of the pipe . <br /> C . Fittings : Measurement of cast iron and ductile iron fittings shall be on the <br /> basis of weight. The weights used to determine the quantity installed shall be <br /> the weights of the appropriate fittings as listed in the supplier' s invoice or <br /> catalog . When mechanical joint fittings are required , the weight of the gland <br /> bolts and gaskets shall not be added to the listed weight of the fittings . <br /> Where flanged fittings are furnished , the weight of the bolts and gaskets shall <br /> not be included . <br /> D . Gate Valves and Tapping Valves : Measurement shall be on the basis of <br /> furnishing and installing each type and size of valve (and tapping sleeve , if <br /> applicable ) required , including the valve box, cover, and other associated <br /> items . <br /> E . Fire Hydrant Assembly: Measurement of fire hydrant assembly shall be for <br /> the actual number constructed in accordance with the Plans and <br /> Specifications , or as directed by the Engineer, at the unit price bid for the item <br /> " Fire Hydrant Assembly , " scheduled in the Form of Proposal . The unit price <br /> for " Fire Hydrant Assembly" shall include cutting bituminous paving , removal <br /> of paving courses and curb if required , excavation , furnishing and Installation <br /> of 10 ' (6" ) D . I . P . water main , dry-barrel traffic hydrant, concrete foundations <br /> for hydrant, fitting , one ( 1 ) 6" diameter gate valve , concrete thrust block <br /> ( reaction backing ) for fire hydrant , backfill , blue reflective markers , all <br /> materials , equipment , labor and all else necessary therefore and incidental <br /> thereto . <br /> F . Water Service : Measurement of water service lateral shall include furnishing <br /> and construction of piping and appurtenances to carry and distribute water <br /> from the water main to the edge of the Right-of-Way for future service to <br /> individual property owners . The work shall include , but shall not be limited to , <br /> cutting of existing pavement where required , jack and bore of existing <br /> pavement where required , excavation , installation (of pipe , meter boxes , <br /> connections and associated appurtenances ) , backfilling , testing , disinfection , <br /> and all restoration in kind . The services shall be of a type and size specified , <br /> and shall be constructed in accordance with these Plans and Specification , or <br /> as directed by the Engineer. <br /> G . HDPE Horizontal Directional Bore : Measurement of HDPE horizontal <br /> directional bore shall include all material ( including HDPE pipe) , equipment , <br /> supplies , fuel , labor, sheeting and bracing , jacking and boring pits ( if <br /> required ) , excavation , dewatering , backfilling , compaction , mechanical <br /> fittings , restoration , furnishing and installing HDPE pipe . Payments shall be <br /> based on the lengths specified in the Schedule of Bid Items . Directional bore <br /> lengths specified in the Schedule of Bid Items are estimated quantities . <br /> Contractor will be compensated for directional bores on a proportionate linear <br /> foot basis (e . g . an 80 foot long bore estimated at 70 feet in the schedule of <br /> bid items will be compensated at the ratio of 8/7 times the unit price . <br /> Likewise a 60 foot long bore estimated at 70 feet in the schedule of bid items <br /> will be compensated at the ratio of 6/7 times the unit price ) . Indian River <br /> 01025-2 <br /> F :\Utilities\UTILITY - ENGINEERING\Projects - Utility Construction Permits\IRC - Labor Contract RE-BID for 2005- _ <br /> - - - 2006\BID DOCUMENTS - USE ONLY FOR THIS-PROJE-CT\BiD -DOCUMENTS\01025 Measurement and Payment.doc <br />