Laserfiche WebLink
does not involve a change in the Contract Price or the Contract 35. Project Manual--The bound documentary <br /> Times . information prepared for bidding and constructing the Work. A <br /> listing of the contents of the Project Manual , which may be <br /> 22. General Requirements--Sections of Division 1 of bound in one or more volumes , is contained in the table(s ) of <br /> the Specifications. The General Requirements pertain to all contents , <br /> sections of the Specifications . <br /> 36. Radioactive Material--Source, special nuclear, or <br /> 23. Hazardous Environmental Condition—The byproduct material as defined by the Atomic Energy Act of 1954 <br /> presence at the Site of Asbestos , PCBs, Petroleum, Hazardous (42 USC Section 2011 et seq . ) as amended from time to time. <br /> Waste, or Radioactive Material in such quantities or <br /> circumstances that may present a substantial danger to persons 37 . Resident Project Representative—The authorized <br /> or property exposed thereto in connection with the Work. representative of ENGINEER who may be assigned to the Site <br /> or any part thereof. <br /> 24. Hazardous Waste—The term Hazardous Waste <br /> shall have the meaning provided in Section 1004 of the Solid 38. Samples—Physical examples of materials, <br /> Waste Disposal Act (42 USC Section 6903) as amended from equipment, or workmanship that are representative of some <br /> time to time. portion of the Work and which establish the standards by which <br /> such portion of the Work will be judged . <br /> 25. Laws and Regulations; Laws or Regulations--Any <br /> and all applicable laws, rules, regulations, ordinances , codes, 39. Shop Drawings—All drawings, diagrams, Illustra- <br /> and orders of any and all governmental bodies, agencies, tions, schedules, and other data or information <br /> which are <br /> authorities , and courts having Jurisdiction. specifically prepared or assembled by or for CONTRACTOR <br /> and submitted by CONTRACTOR to illustrate some portion of <br /> 26. Liens--Charges, security interests, or the Work, <br /> encumbrances upon Project funds, real property, or personal <br /> property. 40. Site--Lands or areas indicated in the Contract <br /> Documents as being fumished by OWNER upon which the <br /> 27. Milestone--A principal event specified in the Work is to be performed, including rights-of-way and easements <br /> Contract Documents relating to an Intermediate completion date for access thereto, and such other lands furimished by OWNER <br /> or time prior to Substantial Completion of all the Work. which are designated for the use of CONTRACTOR. <br /> 28. Notice of Award--The written notice by OWNER 41 . Specifications—That part of the Contract <br /> to the apparent successful bidder stating that upon timely Documents consisting of written technical <br />descriptions of <br /> compliance by the apparent successful bidder with the materials, equipment, systems, standards, and workmanship as <br /> conditions precedent listed therein, OWNER will sign and applied to the Work and certain administrative details applicable <br /> deliver the Agreement. thereto. <br /> 29. Notice to Proceed--A written notice given by 42. Subcontractor—An individual or entity having <br /> a <br /> OWNER to CONTRACTOR fixing the date on which the Con- direct contract with CONTRACTOR or with any other <br /> tract Times will commence to run and on which CONTRACTOR Subcontractor for the performance of a part of the Work at the <br /> shall start to perform the Work under the Contract Documents. Site. <br /> 30. OWNER--The Individual , entity, public body, or 43. Substantial Completion--The time at which the <br /> authority with whom CONTRACTOR has entered into the Work (or a specified part thereof) has progressed to the <br /> point <br /> Agreement and for whom the Work is to be performed. where, in the opinion of ENGINEER, the Work (or a specified <br /> part thereof) is sufficiently complete, in accordance with the <br /> 31 . Partial Utilization--Use by OWNER of a substan- Contract Documents, so that the Work (or a specified <br /> part <br /> tially completed part of the Work for the purpose for which it is thereof) can be utilized for the purposes for which it is intended <br />. <br /> intended (or a related purpose) prior to Substantial Completion The terms "substantially complete" and "substantially com- <br /> of all the Work. pleted" as applied to all or part of the Work refer to Substantial <br /> Completion thereof. <br /> 32. PCBs—Polychlorinated biphenyls . <br /> 44. Supplementary Conditions—That part of the <br /> 33. Petroleum--Petroleum, including crude oil or any Contract Documents which amends or supplements these <br /> fraction thereof which is liquid at standard conditions of General Conditions. <br /> temperature and pressure (60 degrees Fahrenheit and 14. 7 <br /> pounds per square inch absolute), such as oil , petroleum, fuel 45. Supplier--A manufacturer, fabricator, supplier, <br /> oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with distributor, materialman, or vendor having a direct contract with <br /> other non-Hazardous Waste and crude oils. CONTRACTOR or with any Subcontractor to furnish materials <br /> or equipment to be incorporated in the Work by CONTRACTOR <br /> 34. Project--The total construction of which the Work or any Subcontractor. <br /> to be performed under the Contract Documents may be the <br /> whole, or a part as may be indicated elsewhere in the Contract 46. Underground Facilities--All underground <br /> Documents . pipelines , conduits , ducts, cables, wires , manholes , vaults , <br /> tanks , tunnels, or other such facilities or attachments , and any <br /> encasements containing such facilities , including those that <br /> 00700 - 6 <br />