convey electricity, gases , steam, liquid petroleum products ,
<br /> telephone or other communications , cable television, water, 1 . The word "defective," when modifying the word
<br /> wastewater, storm water, other liquids or chemicals , or traffic or "Work," refers to Work that is unsatisfactory, faulty, or
<br /> other control systems , deficient in that it does not conform to the Contract
<br /> Documents or does not meet the requirements of any
<br /> 47 . Unit Price Work--Work to be paid for on the basis inspection, reference standard , test, or approval
<br /> of unit prices, referred to in the Contract Documents, or has been
<br /> damaged prior to ENGINEER's recommendation of final
<br /> 48. Work--The entire completed construction or the payment (unless responsibility for the protection thereof
<br /> various separately identifiable parts thereof required to be has been assumed by OWNER at Substantial
<br /> provided under the Contract Documents . Work includes and is Completion in accordance with paragraph 14.04 or
<br /> the result of performing or providing all labor, services, and 14.05),
<br /> documentation necessary to produce such construction , and
<br /> furnishing , installing , and incorporating all materials and equip- D. Furnish, install, Perform, Provide
<br /> ment into such construction, all as required by the Contract
<br /> Documents . 1 . The word "furnish," when used in connection with
<br /> services , materials, or equipment, shall mean to supply
<br /> 49. Work Change Directive--A written statement to and deliver said services , materials , or equipment to the
<br /> CONTRACTOR issued on or after the Effective Date of the Site (or some other specified location) ready for use
<br />or
<br /> Agreement and signed by OWNER and recommended by installation and in usable or operable condition.
<br /> ENGINEER ordering an addition, deletion, or revision in the
<br /> Work, or responding to differing or unforeseen subsurface or 2. The word "install ," when used in connection with
<br /> physical conditions under which the Work Is to be performed or services , materials , or equipment, shall mean to put into
<br /> to emergencies. A Work Change Directive will not change the use or place in final position said services, materials , or
<br /> Contract Price or the Contract Times but is evidence that the equipment complete and ready for intended use.
<br /> parties expect that the change ordered or documented by a
<br /> Work Change Directive will be incorporated in a subsequently 3. The words "perform" or "provide," when used In
<br /> Issued Change Order following negotiations by the parties as to connection with services, materials, or equipment, shall
<br /> its effect, if any, on the Contract Price or Contract Times . mean to furnish and install said services, materials, or
<br /> equipment complete and ready for intended use.
<br /> 50. Written Amendment--A written statement
<br /> modifying the Contract Documents , signed by OWNER and 4. When "furnish," "install ," "perform ," or "provide" is
<br /> CONTRACTOR on or after the Effective Date of the Agreement not used in connection with services, materials, or
<br /> and normally dealing with the nonengineering or nontechnical equipment in a context clearly requiring an obligation
<br /> of
<br /> �rfv► rather than strictly construction-related aspects of the Contract CONTRACTOR, "provide" is implied .
<br /> Documents.
<br /> E. Unless stated otherwise in the Contract Documents ,
<br /> 1 . 02 Terminology(tc In "1 . 02 Terminology's words or phrases which have a well-known technical
<br />or
<br /> construction industry or trade meaning are used in the Contract
<br /> A. Intent of Certain Terms or Adjectives Documents In accordance with such recognized meaning .
<br /> 1 . Whenever in the Contract Documents the terms
<br /> "as allowed ," "as approved ," or terms of like effect or import ARTICLE 2 - PRELIMINARY MATTERS& "ARTICLE 2 -
<br /> are used, or the adjectives "reasonable," "suitable," PRELIMINARY MATTERS")
<br /> "acceptable," "proper," "satisfactory," or adjectives of like
<br /> effect or import are used to describe an action or
<br /> determination of ENGINEER as to the Work, it is intended 2 . 01 Delivery of Bonds(tc \n "2 .01 Delivery of
<br /> that such action or determination will be solely to evaluate, Bonds")
<br /> in general, the completed Work for compliance with the
<br /> requirements of and Information in the Contract Documents A. When CONTRACTOR delivers the executed
<br /> and conformance with the design concept of the completed Agreements to OWNER, CONTRACTOR shall also deliver to
<br /> Project as a functioning whole as shown or indicated in the OWNER such Bonds as CONTRACTOR may be required to
<br /> Contract Documents (unless there is a specific statement furnish.
<br /> indicating otherwise). The use of any such term or adjective
<br /> shall not be effective to assign to ENGINEER any duty or 2 . 02 Copies of Documents{tc In "2. 02 Copies of
<br /> authority to supervise or direct the performance of the Work Documents 's
<br /> or any duty or authority to undertake responsibility contrary
<br /> to the provisions of paragraph 9. 10 or any other provision of A. OWNER shall furnish to CONTRACTOR up to ten
<br /> the Contract Documents . copies of the Contract Documents. Additional copies will be
<br /> furnished upon request at the cost of reproduction.
<br /> B. Day
<br /> 2. 03 Commencement of Contract Times; Notice to
<br /> 1 . The word "day' shall constitute a calendar day of Proceed{tc In 703 Commencement of Contract
<br /> 24 hours measured from midnight to the next midnight. Times; Notice to Proceed")
<br /> %Nr C. Defective
<br /> 00700 - 7
<br />
|