My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-090
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2016 10:51:08 AM
Creation date
9/30/2015 8:31:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/15/2005
Control Number
2005-090
Agenda Item Number
11.J.2
Entity Name
Danella Companies, Inc.
Subject
Water,Sewer & Reclaim Water Line Replacement/ Labor Contract
Bid Number
7033
Archived Roll/Disk#
4001
Supplemental fields
SmeadsoftID
4826
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. The Contract Times will commence to run on the <br /> thirtieth day after the Effective Date of the Agreement or, if a 2 . 06 Preconstruction Conferenceftc In "2. 06 <br /> Notice to Proceed is given , on the day indicated in the Notice to Preconstruction Conference ") <br /> Proceed. A Notice to Proceed may be given at any time within <br /> 30 days after the Effective Date of the Agreement. In no event A. Within 20 days after the Contract Times start to run , <br /> will the Contract Times commence to run later than the sixtieth but before any Work at the Site is started , <br /> a conference <br /> day after the day of Bid opening or the thirtieth day after the attended by CONTRACTOR, ENGINEER, and others as <br /> Effective Date of the Agreement, whichever date is earlier, appropriate will be held to establish a working understanding <br /> among <br /> Redt to parties as to the Work and to discuss the schedules <br /> 2. 04 Starting the Work{tc In 02. 04 Starting the <br /> Work paragraph 2. 05. 6, procedures for handling Shop <br /> Drawings and other submittals , processing Applications for <br /> A. CONTRACTOR shall start to perform the Work on the Payment, and maintaining required records, <br /> date when the Contract Times commence to run. No Work 2. 07 Initial Acceptance of Schedules(tc In `2. 07 <br /> shall be done at the Site prior to the date on which the Contract Initial Acceptance of Schedules ' <br /> Times commence to run. <br /> A. Unless otherwise provided in the Contract Docu- <br /> 2. 05 Before Starting Constructionftc In 72. 05 ments , at least ten days before submission of <br /> the first <br /> Before Starting Construction Application for Payment a conference attended by CON- <br /> TRACTOR, ENGINEER, and others as appropriate will be held <br /> A. CONTRACTOR's Review of Contract Documents: to review for acceptability to ENGINEER as provided below the <br /> Before undertaking each part of the Work, CONTRACTOR shall schedules submitted In accordance with paragraph 2.05. 8, <br /> carefully study and compare the Contract Documents and CONTRACTOR shall have an additional ten days to <br /> make <br /> check and verify pertinent figures therein and all applicable field corrections and adjustments and to complete and resubmit the <br /> measurements. CONTRACTOR shall promptly report in writing schedules. No progress payment shall be made to CON- <br /> to ENGINEER any conflict, error, ambiguity, or discrepancy TRACTOR until acceptable schedules are submitted to <br /> which CONTRACTOR may discover and shall obtain a written ENGINEER. <br /> interpretation or clarification from ENGINEER before proceeding <br /> with any Work affected thereby; however, CONTRACTOR shall 1 . The progress schedule will be acceptable to <br /> not be liable to OWNER or ENGINEER for failure to report any ENGINEER if it provides an orderly progression of the <br /> conflict, error, ambiguity, or discrepancy In the Contract Work to completion within any specified Milestones <br /> and <br /> Documents unless CONTRACTOR knew or reasonably should the Contract Times. Such acceptance will not impose <br /> have known thereof. on ENGINEER responsibility for the progress schedule, <br /> for sequencing, scheduling , or progress of the Work nor <br /> B. Prelirranary Schedules: Within ten days after the interfere with or relieve CONTRACTOR from <br /> Effective Date of the Agreement (unless otherwise specified in CONTRACTOR's full responsibility therefore. <br /> the General Requirements), CONTRACTOR shall submit to <br /> ENGINEER for its timely review: 2. CONTRACTOR's schedule of Shop Drawing and <br /> Sample submittals will be acceptable to ENGINEER If it <br /> 1 . a preliminary progress schedule Indicating the provides a workable arrangement for reviewing and <br /> times (numbers of days or dates) for starting and processing the required submittals . <br /> completing the various stages of the Work, including <br /> any Milestones specified in the Contract Documents ; 3. CONTRACTOR's schedule of values will be <br /> acceptable to ENGINEER as to form and substance If It <br /> 2. a preliminary schedule of Shop Drawing and provides a reasonable allocation of the Contract Price to <br /> Sample submittals which will list each required submittal component parts of the Work. <br /> and the times for submitting, reviewing, and processing <br /> such submittal ; and <br /> ARTICLE 3 - CONTRACT DOCUMENTS : INTENT, <br /> 3. a preliminary schedule of values for all of the AMENDING , REUSE(tc "ARTICLE 3 - <br /> Work which includes quantities and prices of items CONTRACT DOCUMENTS\: INTENT, AMENDING, <br /> which when added together equal the Contract Price REUSE"} <br /> and subdivides the Work into component parts in <br /> sufficient detail to serve as the basis for progress <br /> payments during performance of the Work. Such prices 3.01 Intent(te In "3. 01 Intent `} <br /> will include an appropriate amount of overhead and <br /> profit applicable to each item of Work. A. The Contract Documents are complementary; what <br /> C. Evidence of Insurance: Before any Work at the Site is is called for by one is as binding as if called for by all . <br /> started, CONTRACTOR and OWNER shall each deliver to the B . It is the intent of the Contract Documents to describe <br /> other, with copies to each additional insured identified in the a functionally complete Project (or part thereof) to be <br /> Supplementary Conditions , certificates of Insurance (and other constructed in accordance with the Contract Documents . Any <br /> evidence of insurance which either of them or any additional labor, documentation , services , materials, or equipment <br /> that <br /> insured may reasonably request) which CONTRACTOR and may reasonably be inferred from the Contract Documents or <br /> OWNER respectively are required to purchase and maintain in from prevailing custom or trade usage as being required <br /> to <br /> accordance with Article 5. <br /> 00700 - 8 <br />