Laserfiche WebLink
for permanent structures or permanent changes in existing 4. 03 Differing Subsurface or Physical Conditions(tc 1n <br /> facilities. If CONTRACTOR and OWNER are unable to agree "4 . 03 Differing Subsurface or Physical Conditions") <br /> on entitlement to or on the amount or extent, if any, of any <br /> adjustment in the Contract Price or Contract Times , or both , as A. Notice: If CONTRACTOR believes that any subsur- <br /> a result of any delay in OWNER's furnishing the Site, face or physical condition at or contiguous <br /> to the Site that is <br /> CONTRACTOR may make a Claim therefore as provided in uncovered or revealed either: <br /> paragraph 10.05. <br /> 1 . is of such a nature as to establish that any <br /> B. Upon reasonable written request, OWNER shall "technical data" on which CONTRACTOR is entitled to <br /> furnish CONTRACTOR with a current statement of record legal rely as provided in paragraph 4.02 Is materially <br /> title and legal description of the lands upon which the Work is to inaccurate; or <br /> be performed and OWNER's interest therein as necessary for <br /> giving notice of or filing a mechanic's or construction lien against 2. is of such a nature as to require a change in the <br /> such lands in accordance with applicable Laws and Regula- Contract Documents ; or <br /> tions. <br /> 3. differs materially from that shown or indicated in <br /> C. CONTRACTOR shall provide for all additional lands the Contract Documents; or <br /> and access thereto that may be required for temporary <br /> construction facilities or storage of materials and equipment 4. is of an unusual nature, and differs materially <br /> from <br /> conditions ordinarily encountered and generally recognized as <br /> 4.02 Subsurface and Physical Conditions{tc W "4. 02 inherent in work of the character provided for In the Contract <br /> Subsurface and Physical Conditions ' Documents ; <br /> A Reports and Drawings: The Supplementary then CONTRACTOR shall, promptly after becoming aware <br /> Conditions identify: thereof and before further disturbing the subsurface or physical <br /> conditions or performing any Work in connection therewith <br /> 1 .those reports of explorations and tests of (except in an emergency as required by paragraph 6. 16.A), <br /> subsurface conditions at or contiguous to the Site that notify OWNER and ENGINEER in writing about such condition. <br /> ENGINEER has used in preparing the Contract Docu- CONTRACTOR shall not further disturb, such condition or <br /> ments ; and perform any Work In connection therewith (except as aforesaid ) <br /> 2. those drawings of physical conditions in or relat- <br /> until receipt of written order to do so, <br /> ing to existing surface or subsurface structures at or B. ENGINEER's Review: After receipt of written notice <br /> contiguous to the Site (except Underground Facilities) as required by paragraph 4.03.A, ENGINEER will promptly <br /> that ENGINEER has used in preparing the Contract review the pertinent condition , determine the necessity <br /> of <br /> Documents, OWNER's obtaining additional exploration or tests with respect <br /> thereto, and advise OWNER in writing (with a copy to <br /> B. Limited Reliance by CONTRACTOR on Technical CONTRACTOR) of ENGINEER's findings and conclusions. <br /> Data Authorized: CONTRACTOR may rely upon the general <br /> accuracy of the "technical data" contained in such reports and C. Possible Price and Times Adjustments <br /> drawings, but such reports and drawings are not Contract Docu- <br /> ments. Such "technical data" is identified in the Supplementary 1 . The Contract Price or the Contract Times, <br /> or <br /> Conditions. Except for such reliance on such "technical data," both, will be equitably adjusted to the extent that <br /> the <br /> CONTRACTOR may not rely upon or make any Claim against existence of such differing subsurface or physical <br /> OWNER, ENGINEER, or any of ENGiNEER's Consultants with condition causes an increase or decrease In <br /> respect to: CONTRACTOR's cost of, or time required for, perfor- <br /> 1 . the completeness of such reports and drawings mance of the Work; subject, however, to the following : <br /> for CONTRACTOR's purposes , including , but not a , such condition must meet any one or more <br /> limited to, any aspects of the means, methods, of the categories described in paragraph 4.03,A; <br /> techniques , sequences, and procedures of construction and <br /> to be employed by CONTRACTOR, and safety precau- <br /> tions and programs incident thereto; or b. with respect to Work that is paid for on a <br /> Unit Price Basis , any adjustment in Contract Price <br /> 2. other data , interpretations, opinions, and will be subject to the provisions of paragraphs 9. 08 <br /> information contained in such reports or shown or and 11 . 03. <br /> indicated in such drawings; or <br /> 2, CONTRACTOR shall not be entitled to any <br /> 3. any CONTRACTOR interpretation of or adjustment in the Contract Price or Contract Times it <br /> conclusion drawn from any "technical data" or any such <br /> other data, interpretations , opinions , or information. a. CONTRACTOR knew of the existence of <br /> such conditions at the time CONTRACTOR made a <br /> final commitment to OWNER in respect of Contract <br /> Price and Contract Times by the submission of a <br /> Bid or becoming bound under a negotiated contract; <br /> or <br /> 00700 - 10 <br />