Laserfiche WebLink
TRACTOR shall , promptly after becoming aware thereof <br /> b. the existence of such condition could and before further disturbing conditions affected thereby <br /> reasonably have been discovered or revealed as a or performing any Work in connection therewith (except <br /> result of any examination, investigation , exploration , in an emergency as required by paragraph 6. 16.A), <br /> test, or study of the Site and contiguous areas identify the owner of such Underground Facility and give <br /> required by the Bidding Requirements or Contract written notice to that owner and to OWNER and ENGI- <br /> Documents to be conducted by or for CON- NEER. ENGINEER will promptly review the Under- <br /> TRACTOR prior to CONTRACTOR's making such ground Facility and determine the extent, if any, to <br /> final commitment; or which a change is required in the Contract Documents <br /> to reflect and document the consequences of the <br /> c. CONTRACTOR failed to give the written existence or location of the Underground Facility. <br /> notice within the time and as required by paragraph During such time, CONTRACTOR shall be responsible <br /> 4.03.A. for the safety and protection of such Underground <br /> Facility, <br /> 3, If OWNER and CONTRACTOR are unable to <br /> agree on entitlement to or on the amount or extent, If 2. If ENGINEER concludes that a change in the <br /> any, of any adjustment in the Contract Price or Contract Contract Documents is required , a Work Change <br /> Times , or both, a Claim may be made therefore as Directive or a Change Order will be issued to reflect and <br /> provided in paragraph 10.05. However, OWNER, document such consequences . An equitable <br /> ENGINEER, and ENGINEER's Consultants shall not be adjustment shall be made in the Contract Price of <br /> liable to CONTRACTOR for any claims , costs, losses , Contract Times, or both, to the extent that they are <br /> or damages (including but not limited to all fees and attributable to the existence or location of any <br /> charges of engineers , architects, attorneys, and other Underground Facility that was not shown or indicated or <br /> professionals and all court or arbitration or other dispute not shown or indicated with reasonable accuracy in the <br /> resolution costs ) sustained by CONTRACTOR on or in Contract Documents and that CONTRACTOR did not <br /> connection with any other project or anticipated project. know of and could not reasonably have been expected <br /> to be aware of or to have anticipated . If OWNER and <br /> 4.04 Underground Facilitiesftc In 74. 04 Underground CONTRACTOR are unable to agree on entitlement to or <br /> Facilities7 on the amount or extent, if any, of any such adjustment <br /> in Contract Price or Contract Times , OWNER or <br /> A. Shown or Indicated: The information and data shown CONTRACTOR may make a Claim therefore as <br /> or indicated in the Contract Documents with respect to existing provided in paragraph 10. 05. <br /> Underground Facilities at or contiguous to the Site is based on <br /> information and data furnished to OWNER or ENGINEER by 4. 05 Reference Pointsftc In "4. 05 Reference <br /> the owners of such Underground Facilities, including OWNER, Paints ") <br /> or by others. Unless it is otherwise expressly provided in the <br /> Supplementary Conditions: A. OWNER shall provide engineering surveys to <br /> establish reference points for construction which in <br /> 1 , OWNER and ENGINEER shall not be ENGINEER's judgment are necessary to enable CON- <br /> responsible for the accuracy or completeness of any TRACTOR to proceed with the Work. CONTRACTOR shall be <br /> such information or data ; and responsible for laying out the Work, shall protect and preserve <br /> the established reference points and property monuments , and <br /> 2. the cost of all of the following will be included in shall make no changes or relocations without the prior written <br /> the Contract Price, and CONTRACTOR shall have full approval of OWNER. CONTRACTOR shall report to <br /> responsibility for: ENGINEER whenever any reference point or property <br /> monument is lost or destroyed or requires relocation because of <br /> a. reviewing and checking all such information necessary changes in grades or locations, and shall <br /> be <br /> and data, responsible for the accurate replacement or relocation of such <br /> reference points or property monuments by professionally <br /> b. locating all Underground Facilities shown or qualified personnel. <br /> indicated in the Contract Documents , <br /> 4. 06 Hazardous Environmental Condition at Siteftc In <br /> c. coordination of the Work with the owners of "4. 06 Hazardous Environmental Condition at Site 's <br /> such Underground Facilities , including OWNER, <br /> during construction , and A. Reports and Drawings: Reference is made to the <br /> Supplementary Conditions for the identification of those reports <br /> d . the safety and protection of all such Under- and drawings relating to a Hazardous Environmental Condition <br /> ground Facilities and repairing any damage thereto identified at the Site, if any, that have been utilized by <br /> the <br /> resulting from the Work. ENGINEER in the preparation of the Contract Documents . <br /> B . Not Shown or Indicated B. Limited Reliance by CONTRACTOR on Technical <br /> Data Authorized: CONTRACTOR may rely upon the general <br /> 1 . If an Underground Facility is uncovered or accuracy of the "technical data" contained in such reports and <br /> revealed at or contiguous to the Site which was not drawings , but such reports and drawings are <br /> not Contract <br /> shown or indicated , or not shown or indicated with Documents . Such "technical data" is identified <br /> in the <br /> *MW reasonable accuracy in the Contract Documents , CON- Supplementary Conditions . Except for such reliance on such <br /> 00700 - 11 <br />