6 . 11 Use of Site and Other Areas{tc In "6. 11 Use Directives , Field Orders , and written interpretations and <br /> of Site and Other Areas ") clarifications in good order and annotated to show changes <br /> made during construction . These record documents together <br /> A. Limitation on Use of Site and Other Areas with all approved Samples and a counterpart of all approved <br /> Shop Drawings will be available to ENGINEER for reference. <br /> 1 . CONTRACTOR shall confine construction equip- Upon completion of the Work, these record documents , <br /> ment, the storage of materials and equipment, and the Samples, and Shop Drawings will be delivered to ENGINEER <br /> operations of workers to the Site and other areas for OWNER. <br /> permitted by Laws and Regulations , and shall not <br /> unreasonably encumber the Site and other areas with 6. 13 Safety and Protection{tc W "6. 13 Safety and <br /> construction equipment or other materials or equipment. Protection ') <br /> CONTRACTOR shall assume full responsibility for any <br /> damage to any such land or area , or to the owner or A. CONTRACTOR shall be solely responsible for <br /> occupant thereof, or of any adjacent land or areas initiating, maintaining and supervising all safety precautions <br /> and <br /> resulting from the performance of the Work, programs in connection with the Work. CONTRACTOR shall <br /> take all necessary precautions for the safety of, and shall <br /> 2. Should any claim be made by any such owner or provide the necessary protection to prevent damage, injury or <br /> occupant because of the performance of the Work, loss to: <br /> CONTRACTOR shall promptly settle with such other <br /> party by negotiation or otherwise resolve the claim by 1 . all persons on the Site or who may be affected <br /> arbitration or other dispute resolution proceeding or at by the Work; <br /> law. <br /> 2. all the Work and materials and equipment to be <br /> 3. To the fullest extent permitted by Laws and incorporated therein , whether in storage on or off <br /> the <br /> Regulations, CONTRACTOR shall indemnify and hold Site, and <br /> harmless OWNER, ENGINEER, ENGINEER's <br /> Consultant, and the officers, directors , partners , 3. other property at the Site or adjacent thereto, <br /> employees, agents, and other consultants of each and including trees , shrubs, lawns, walks , pavements , <br /> any of them from and against all claims , costs, losses, roadways , structures , utilities, and Underground Facili- <br /> and damages (including but not limited to all fees and ties not designated for removal, relocation, or <br /> charges of engineers , architects, attorneys, and other replacement in the course of construction, <br /> professionals and all court or arbitration or other dispute <br /> resolution costs) arising out of or relating to any claim or B. CONTRACTOR shall comply with all applicable Laws <br /> action, legal or equitable, brought by any such owner or and Regulations relating to the safety of persons or property, or <br /> occupant against OWNER, ENGINEER, or any other to the protection of persons or property from damage, injury, or <br /> party indemnified hereunder to the extent caused by or loss ; and shall erect and maintain all necessary safeguards for <br /> based upon CONTRACTOR's performance of the such safety and protection. CONTRACTOR shall notify owners <br /> Work• of adjacent property and of Underground Facilities and other <br /> utility owners when prosecution of the Work may affect them , <br /> B. Removal of Debris During Performance of the Work: and shalt cooperate with them in the protection, removal <br />, <br /> During the progress of the Work CONTRACTOR shall keep the relocation, and replacement of their property. All damage, <br /> Site and other areas free from accumulations of waste injury, or loss to any property referred to in <br /> paragraph 6. 13.A.2 <br /> materials , rubbish, and other debris. Removal and disposal of or 6. 13.A.3 caused, directly or indirectly, in whole or in <br /> part, by <br /> such waste materials , rubbish, and other debris shall conform to CONTRACTOR, any Subcontractor, Supplier, or any other <br /> applicable Laws and Regulations. individual or entity directly or indirectly employed by any of them <br /> to perform any of the Work, or anyone for whose acts any of <br /> C. Cleaning: Prior to Substantial Completion of the Work them may be liable, shall be remedied by CONTRACTOR <br /> CONTRACTOR shall clean the Site and make it ready for (except damage or loss attributable to the fault of Drawings <br /> or <br /> utilization by OWNER. At the completion of the Work CON- Specifications or to the acts or omissions of OWNER <br /> or <br /> TRACTOR shall remove from the Site all tools , appliances , ENGINEER or ENGINEER's Consultant, or anyone employed <br /> construction equipment and machinery, and surplus materials by any of them , or anyone for whose acts any of them may be <br /> and shall restore to original condition all property not designated liable, and not attributable, directly or indirectly, in whole <br /> or in <br /> for alteration by the Contract Documents, part, to the fault or negligence of CONTRACTOR or any <br /> Subcontractor, Supplier, or other individual or entity directly or <br /> D. Loading Structures: CONTRACTOR shall not load indirectly employed by any of them). CONTRACTOR's duties <br /> nor permit any part of any structure to be loaded in any manner and responsibilities for safety and for protection of the <br /> Work <br /> that will endanger the structure, nor shall CONTRACTOR shall continue until such time as all the Work is completed <br /> and <br /> subject any part of the Work or adjacent property to stresses or ENGINEER has issued a notice to OWNER and <br /> pressures that will endanger It. CONTRACTOR in accordance with paragraph 14. 07. 8 that the <br /> Work is acceptable (except as otherwise expressly provided in <br /> 6. 12 Record Documents{tc \n "6. 12 Record connection with Substantial Completion ). <br /> Documents") <br /> 6. 14 Safety Representative& In "6. 14 Safety <br /> A. CONTRACTOR shall maintain in a safe place at the Representative '} <br /> Site one record copy of all Drawings, Specifications , Addenda , <br /> �► Written Amendments , Change Orders , Work Change <br /> 00700 - 19 <br />