Laserfiche WebLink
2, giving directions or instructions , or failing to give 1 . the individual or entity who will have authority and <br /> them , if that is the primary cause of the injury or responsibility for coordination of the activities <br />among the <br /> damage. various contractors will be identified ; <br /> 2. the specific matters to be covered by such <br /> ARTICLE 7 - OTHER WORK(tc "ARTICLE 7 - OTHER authority and responsibility will be itemized ; and <br /> WORK") <br /> - 3. the extent of such authority and responsibilities <br /> 7. 01 Related Work at Site(tc In "7. 01 Related Work will be provided : <br /> at Site 's B. Unless otherwise provided in the Supplementary <br /> Conditions , OWNER shall have sole authority and responsibility <br /> A. OWNER may perform other work related to the for such coordination. <br /> Project at the Site by OWNER's employees, or let other direct <br /> contracts therefore, or have other work performed by utility <br /> owners. If such other work is not noted in the Contract ARTICLE 8 - OWNER'S RESPONSIBILITIES& "ARTICLE 8 <br /> Documents, then: - OWNER'S RESPONSIBILITIES") <br /> 1 .written notice thereof will be given to CONTRAC- <br /> TOR prior to starting any such other work; and 8. 01 Communications to Contractor{tc In "8. 01 <br /> ' <br /> 2. if OWNER and CONTRACTOR are unable to Communications to Contractor7 <br /> agree on entitlement to or on the amount or extent, if A. Except as otherwise provided in these General Condi- <br /> any, of any adjustment In the Contract Price or Contract tions, OWNER shall issue all communications to <br /> Times that should be allowed as a result of such other CONTRACTOR through ENGINEER. <br /> work, a Claim may be made therefore as provided in <br /> paragraph 10.05. 8 . 02 Replacement of ENGINEER ftc In "8. 02 <br /> B. CONTRACTOR shall afford each other contractor Replacement of ENGINEER "I <br /> who is a party to such a direct contract and each utility owner A. In case of termination of the employment of ENGI- <br /> (and OWNER, if OWNER is performing the other work with NEER, OWNER shall appoint an engineer to whom <br /> OWNER's employees) proper and safe access to the Site and a CONTRACTOR makes no reasonable objection, whose status <br /> reasonable opportunity for the introduction and storage of under the Contract Documents shall be that of the former <br /> ENGI- <br /> materials and equipment and the execution of such other work NEER. <br /> and shall properly coordinate the Work with theirs. Unless <br /> otherwise provided in the Contract Documents , CONTRACTOR 8 . 03 Furnish Data ftc In "8: 03 Furnish Data <br /> shall do all cutting, fitting, and patching of the Work that may be <br /> required to properly connect or otherwise make its several parts A. OWNER shall promptly furnish the data required of <br /> come together and properly integrate with such other work. OWNER under the Contract Documents . <br /> CONTRACTOR shall not endanger any work of others by <br /> cutting, excavating, or otherwise altering their work and will only 8 . 04 Pay Promptly When Dueftc In "8. 04 Pay Promptly <br /> cut or alter their work with the written consent of ENGINEER When Due 's <br /> and the others whose work will be affected. The duties and <br /> responsibilities of CONTRACTOR under this paragraph are for A, OWNER shall make payments to CONTRACTOR <br /> the benefit of such utility owners and other contractors to the promptly when they are due as provided in paragraphs 14.02, <br />C <br /> extent that there are comparable provisions for the benefit of and 14.07. C. <br /> CONTRACTOR in said direct contracts between OWNER and <br /> such utility owners and other contractors . 8. 05 Lands and Easements; Reports and Tests(tc \n <br /> C. If the proper execution or results of any part of "8. 05 Lands and Easements ; Reports and Tests") <br /> CONTRACTOR's Work depends upon work performed by A. OWNER's duties in respect of providing lands and <br /> others under this Article 7, CONTRACTOR shall inspect such easements and providing engineering surveys to establish <br /> other work and promptly report to ENGINEER In writing any reference points are set forth in paragraphs 4.01 <br /> and 4.05, <br /> delays, defects, or deficiencies in such other work that render it Paragraph 4. 02 refers to OWNER's identifying and <br />making <br /> unavailable or unsuitable for the proper execution and results of available to CONTRACTOR copies of reports of explorations <br /> CONTRACTOR's Work. CONTRACTOR's failure to so report and tests of subsurface conditions and drawings of physical <br /> will constitute an acceptance of such other work as fit and conditions in or relating to existing <br />surface or subsurface <br /> proper for integration with CONTRACTOR's Work except for structures at or contiguous to the Site that have been utilized by <br /> latent defects and deficiencies in such other work. ENGINEER In preparing the Contract Documents: <br /> 7. 02 Coordination& In 7. 02 Coordination ") 8 . 06 Insuranceftc In "8. 06 Insurance '? <br /> A. If OWNER intends to contract with others for the A. OWNER's responsibilities , if any, in respect to <br /> pur- <br /> performance of other work on the Project at the Site, the chasing and maintaining liability and property insurance <br /> are set <br /> following will be set forth in Supplementary Conditions : forth in Article 5. <br /> 00700 - 22 <br />