My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-090
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2016 10:51:08 AM
Creation date
9/30/2015 8:31:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/15/2005
Control Number
2005-090
Agenda Item Number
11.J.2
Entity Name
Danella Companies, Inc.
Subject
Water,Sewer & Reclaim Water Line Replacement/ Labor Contract
Bid Number
7033
Archived Roll/Disk#
4001
Supplemental fields
SmeadsoftID
4826
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. 07 Change Orders{tc In 78. 07 Change Orders '7 will determine, in general , if the Work is proceeding <br /> in <br /> accordance with the Contract Documents. ENGINEER will not <br /> A. OWNER is obligated to execute Change Orders as be required to make exhaustive or continuous inspections on indicated <br /> in paragraph 10. 03 . the Site to check the quality or quantity of the Work. <br /> ENGINEER's efforts will be directed toward providing for <br /> 8. 08 Inspections, Tests, and Approvals{tc In "8. 08 OWNER a greater degree of confidence that the completed <br /> Inspections, Tests, andApprovals7 Work will conform generally to the Contract Documents . On the <br /> basis of such visits and observations, ENGINEER will keep <br /> A. OWNER's responsibility in respect to certain inspec- OWNER informed of the progress of the Work and will endeav- <br /> tions , tests, and approvals is set forth in paragraph 13. 03. B . or to guard OWNER against defective Work. <br /> 8. 09 Limitations on OWNER's Responsibilities& In B . ENGINEER's visits and observations are subject to all <br /> "8. 09 Limitations on OWNER's Responsibilities ") the limitations on ENGINEER's authority and responsibility set <br /> forth in paragraph 9. 10, and particularly, but without limitation, <br /> A. The OWNER shall not supervise, direct, or have during or as a result of ENGINEER's visits or observations <br /> of <br /> control or authority over, nor be responsible for, CONTRACTOR's Work ENGINEER will not supervise, direct, <br /> CONTRACTOR's means , methods , techniques, sequences , or control , or have authority over or be responsible for <br /> procedures of construction , or the safety precautions and CONTRACTOR's means , methods , techniques , sequences , <br /> or <br /> programs incident thereto, or for any failure of CONTRACTOR procedures of construction , or the safety precautions <br /> and <br /> to comply with Laws and Regulations applicable to the perfor- programs incident thereto, or for any failure of CONTRACTOR <br /> mance of the Work. OWNER will not be responsible for to comply with Laws and Regulations applicable <br /> to the <br /> CONTRACTOR's failure to perform the Work in accordance performance of the Work, <br /> with the Contract Documents . <br /> 9. 03 Project Representative& In "9. 03 Project <br /> 8. 10 Undisclosed Hazardous Environmental Condition{tc Representative ') <br /> In "8. 10 Undisclosed Hazardous Environmental Condition 's <br /> A. If OWNER and ENGINEER agree, ENGINEER will <br /> A. OWNER's responsibility in respect to an undisclosed furnish a Resident Project Representative to assist ENGINEER <br /> Hazardous Environmental Condition is set forth in paragraph in providing more extensive observation of the Work. <br /> The <br /> 4.06. responsibilities and authority and limitations thereon of any such <br /> Resident Project Representative and assistants will be as <br /> 8. 11 Evidence of Financial Arrangemenfsftc In "8. 11 provided in paragraph 9. 10 and in the Supplementary <br /> Evidence of Financial Arrangements7 Conditions . If OWNER designates another representative or <br /> agent to represent OWNER at the Site who is not ENGINEER's <br /> V"" A. If and to the extent OWNER has agreed to furnish Consultant, agent or employee, the responsibilities and authority <br /> CONTRACTOR reasonable evidence that financial and limitations thereon of such other individual or entity will be <br /> arrangements have been made to satisfy OWNER's obligations as provided in the Supplementary Conditions . <br /> under the Contract Documents , OWNER's responsibility in <br /> respect thereof will be as set forth in the Supplementary 9. 04 Clarifications and Interpretations& In 79. <br />01 <br /> Conditions . Cladricafions and Interpretations ') <br /> A. ENGINEER will issue with reasonable promptness <br /> ARTICLE 9 - ENGINEER'S STATUS DURING such written clarifications or interpretations of the requirements <br /> CONSTRUCTION& "ARTICLE 9 - ENGINEER'S STATUS of the Contract Documents as ENGINEER may determine <br /> DURING CONSTRUCTION") necessary, which shall be consistent with the intent of and <br /> reasonably inferable from the Contract Documents . Such <br /> written clarifications and interpretations will be binding on <br /> 9. 01 OWNER'S Representative& In "9. 01 OWNERS OWNER and CONTRACTOR. If OWNER and CONTRACTOR <br /> Representative 's are unable to agree on entitlement to or on the amount or <br /> extent, if any, of any adjustment in the Contract Price or <br /> A. ENGINEER will be OWNER's representative during Contract Times , or both, that should be allowed as a result of a <br /> the construction period . The duties and responsibilities and the written clarification or interpretation, a Claim may <br /> be made <br /> limitations of authority of ENGINEER as OWNER's therefore as provided in paragraph 10.05. <br /> representative during construction are set forth in the Contract <br /> Documents and will not be changed without written consent of 9. 05 Authorized Variations in Work{tc In "9. 05 <br /> OWNER and ENGINEER. Authorized Variations in Work"} <br /> 9. 02 Visits to Site{tc In "9. 02 Visits to Site '} A. ENGINEER may authorize minor variations in the <br /> Work from the requirements of the Contract Documents which <br /> A. ENGINEER will make visits to the Site at intervals do not involve an adjustment in the Contract <br /> Price or the <br /> appropriate to the various stages of construction as ENGINEER Contract Times and are compatible with the design concept of <br /> deems necessary in order to observe as an experienced and the completed Project as a functioning whole as indicated by the <br /> qualified design professional the progress that has been made Contract Documents . These may be accomplished by a Field <br /> and the quality of the various aspects of CONTRACTOR's Order and will be binding on OWNER and also <br /> on CON- <br /> executed Work. Based on information obtained during such TRACTOR, who shall perform the Work involved promptly. If <br /> visits and observations , ENGINEER, for the benefit of OWNER, OWNER and CONTRACTOR are unable to agree on <br /> 00700 - 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.