entitlement to or on the amount or extent, if any, of any to this paragraph 9.09 with respect to any <br /> such Claim , dispute, <br /> adjustment in the Contract Price or Contract Times , or both, as or other matter (except any which have been waived <br /> by the <br /> a result of a Field Order, a Claim may be made therefore as making or acceptance of final payment <br /> as provided in <br /> provided in paragraph 10. 05. paragraph 14.07 ) will be a condition precedent to any exercise <br /> by OWNER or CONTRACTOR of such rights or remedies as <br /> 9 .06 Rejecting Defective Work{tc In 19. 06 Rejecting either may otherwise have under the Contract Documents or by <br /> Defective Work's Laws or Regulations in respect of any such Claim , dispute, or <br /> A. ENGINEER will have authority to disapprove or reject other matter. <br /> Work which ENGINEER believes to be defective, or that 9. 10 Limitations on ENGINEER's Authority and Respon- <br /> ENGINEER believes will not produce a completed Project that slbilities{tc In "9. 10 Limitations on ENGINEER 's <br /> conforms to the Contract Documents or that will prejudice the Authority and Responsibilities ' <br /> integrity of the design concept of the completed Project as a <br /> functioning whole as indicated by the Contract Documents , A. Neither ENGINEER's authority or responsibility under <br /> ENGINEER will also have authority to require special inspection this Article 9 or under any other provision of the <br /> Contract <br /> or testing of the Work as provided in paragraph 13. 04, whether Documents nor any decision made by ENGINEER in good faith <br /> or not the Work Is fabricated , installed , or completed, either to exercise or not exercise such authority or responsibility <br /> or the undertaking, exercise, or performance of any authority or <br /> 9.07 Shop Drawings, Change Orders and Payments{tc responsibility by ENGINEER shall create, impose, or give rise to <br /> In 79. 07 Shop Drawings, Change Orders and Paymentsany duty in contract, tort, or otherwise owed by ENGINEER to <br /> CONTRACTOR, any Subcontractor, any Supplier, any other <br /> A. In connection with ENGINEER's authority as to Shop individual or entity, or to any surety for or employee or agent of <br /> Drawings and Samples , see paragraph 6. 17, any of them. <br /> B, In connection with ENGINEER's authority as to B. ENGINEER will not supervise, direct, control, or have <br /> Change Orders, see Articles 10, 11 , and 12. authority over or be responsible for CONTRACTOR's means , <br /> methods, techniques , sequences , or procedures of <br /> C. In connection with ENGINEER's authority as to construction, or the safety precautions and programs <br /> incident <br /> Applications for Payment, see Article 14. thereto, or for any failure of CONTRACTOR to comply with <br /> Laws and Regulations applicable to the performance of the <br /> 9.08 Determinations for Unit Price Work{tc \n "9.08 Work. ENGINEER will not be responsible for CONTRACTOR's <br /> Detemrinations for Unit Price Work"j failure to perform the Work in accordance with the Contract <br /> Documents, <br /> A. ENGINEER will determine the actual quantities and <br /> classifications of Unit Price Work performed by C. ENGINEER will not be responsible for the acts or <br /> CONTRACTOR. ENGINEER will review with CONTRACTOR omissions of CONTRACTOR or of any Subcontractor, any <br /> the ENGINEER's preliminary determinations on such matters Supplier, or of any other individual or entity performing any <br /> of <br /> before rendering a written decision thereon (by recommendation the Work, <br /> of an Application for Payment or otherwise). ENGINEER's <br /> written decision thereon will be final and binding (except as D. ENGINEER's review of the final Application <br /> for <br /> modified by ENGINEER to reflect changed factual conditions or Payment and accompanying documentation and all mainte- <br /> more accurate data ) upon OWNER and CONTRACTOR, nance and operating instructions, schedules , guarantees , <br /> subject to the provisions of paragraph 10.05. Bonds, certificates of Inspection, tests and approvals, and other <br /> documentation required to be delivered by paragraph 14. 07 .A <br /> 9. 09 Decisions on Requirements of Contract Documents will only be to determine generally that their content complies <br /> and Acceptability of Work& In "9. 09 Decisions on with the requirements of, and In the case of certificates of in- <br /> Requirements of Contract Documents and Acceptability of spections, tests , and approvals that the results certified indicate <br /> Work7 compliance with, the Contract Documents. <br /> A. ENGINEER will be the initial interpreter of the E. The limitations upon authority and responsibility <br /> set <br /> requirements of the Contract Documents and judge of the forth in this paragraph 9. 10 shall also apply to <br /> ENGINEER's <br /> acceptability of the Work thereunder. Claims, disputes and Consultants, Resident Project Representative, and assistants . <br /> other matters relating to the acceptability of the Work, the <br /> quantities and classifications of Unit Price Work, the ARTICLE 10 - CHANGES IN THE WORK; CLAIMS& <br /> interpretation of the requirements of the Contract Documents "ARTICLE 10 - CHANGES iN THE WORK; CLAIMS") <br /> pertaining to the performance of the Work, and Claims seeking <br /> changes in the Contract Price or Contract Times will be referred <br /> initially to ENGINEER in writing, in accordance with the 10. 01 Authorized Changes in the Work& In "10. <br />01 <br /> provisions of paragraph 10. 05, with a request for a formal Authorized Changes in the Work" <br /> decision. <br /> A. Without invalidating the Agreement and without notice <br /> B. When functioning as interpreter and judge under this to any surety, OWNER may, at any time or from time to time, <br /> paragraph 9.09, ENGINEER will not show partiality to OWNER order additions , deletions , or revisions In the Work by a Written <br /> or CONTRACTOR and will not be liable in connection with any Amendment, a Change Order, or a Work Change Directive. <br /> interpretation or decision rendered in good faith in such Upon receipt of any such document, <br /> CONTRACTOR shall <br /> capacity. The rendering of a decision by ENGINEER pursuant promptly proceed with the Work involved which <br /> will be <br /> 00700 - 24 <br />