Laserfiche WebLink
B. REMOVAL OF EXISTING POLES OR STRUCTURES <br /> Provide pricing for labor to take down existing poles , structures and fixtures and remove them to a <br /> staging area on the job site designated by the owner. Concrete and steel poles will be completely <br /> removed . Poles will be cut at base — foundations will not be removed but cut and jack-hammered <br /> to a foot below grade. Wood poles may be cut off 2 feet below grade, as long as the stumps are <br /> covered back with soil . <br /> C. INSTALLATION OF FIXTURES ON EXISTING POLES <br /> Provide pricing for labor to take down existing fixtures and remove them to a staging area on the <br /> job site designated by the owner. The cost will also include labor to install the new fixtures on the <br /> existing structure . Installation assumes that the pole structure and wiring will be sufficient to handle <br /> the new fixtures . Owner assumes all responsibility of structural integrity of existing poles . <br /> D. OWNER AND BIDDER RESPONSIBILITIES <br /> 1 . Owner's Responsibilities : <br /> a. Total access to the site and pole locations for construction . Must be able to move from <br /> location to location on standard rubber tires — no towing required . <br /> b . Survey in pole locations . <br /> c. Removal of any trees , limbs, etc. for total access to pole locations . <br /> d . Removal and replacing of all fencing. <br /> e. Repair and replacement of any field turf, asphalt, and/or concrete damage . <br /> f. Locate existing underground utilities including irrigation systems. <br /> g . Pay for all permitting costs. <br /> h. Extra costs associated with foundation excavation and construction in non-standard soils <br /> (rock, caliche, high water table, collapsing holes, alluvial soils, etc. ). Standard soils are <br /> defined as Class 5 soils in Table 1804.2 in the 2004 edition of the Florida Building Code <br /> and can be excavated using standard earth auguring equipment. <br /> i. Provide primary transformer to within 150' of site. <br /> j . Provide a source for water (I . E. Fire Hydrant or 1 " water line). <br /> k. Provide adequate trash container for cardboard waste. <br /> 2. Bidder's Responsibilities: <br /> a. Provide required poles , fixtures , and foundations and associated designs . <br /> b. Provide structural design for poles and foundations, certified by a professional engineer <br /> licensed in the State. <br /> c. Provide layout of pole locations and aiming diagram . <br /> d . Provide light test upon owner supplied electrical system . <br /> e. Provide equipment and materials to off load equipment at jobsite per scheduled delivery. <br /> f. Secure required permits, owner to pay cost of permits. <br /> g . Provide equipment and materials to install poles and foundations as specified on layout. <br /> h . Provide and install ground rods (one per pole location) for lightning protection per NFPA <br /> 780 Code. Poles 70' and below require a #2 ground wire . Poles 80' and above require 2/0 <br /> ground wire . Ground rods to be 3/4"x10' or 5/8"x8' with a 10' embedment. <br /> 1 . Provide materials and equipment to assemble fixtures. <br /> j . Provide equipment and materials to assemble and erect poles. <br /> k. Provide equipment and materials to remove spoils from jobsite. <br /> I . Provide bonding per State of Florida requirements <br /> VIII . ELECTRICAL SUPPLY LABOR/EQUIPMENT <br /> A. ELECTRICAL SERVICES <br /> All services are to be quoted at 277/480 volt three phase. Base all service feeders on a length of <br /> 150 feet at a burial depth of 36" with no obstructions in the path . Provide lump sum costs for <br /> equipment and labor to install each of the following three options: <br /> Jacksonville Spec 04-24r5.doc 10 Created on 12/1 /2006 4:32 PM <br />