Soccer - Standard pole locations for a 4-pole design would be located at a distance of (Field Length/2 -
<br /> ((Field Width/2 + Setback) x 0.40)) from the center line, with setbacks from the field as given above .
<br /> Standard outside pole locations for a 6-pole design would be located at a distance of (Field Length/2 -
<br /> Field Width/2 + Setback x 0. 28 from the center line, with setbacks from the field as giv en below.
<br /> Light Set- LSG 110 Exp B LSG 140 Exp C SCG
<br /> Size Level back Price Price Price
<br /> 330'x160' 30 fc 30' $60, 609 $75,684 $33, 598
<br /> 330'x160' 50 fc $98, 963 $123 ,297 $62,259
<br /> 330'x180 ' 30 fc 30' $78, 319 $103 ,756 $44, 098
<br /> 330'x180' 50 fc $ 108 ,556 $132 ,503 $70, 703
<br /> 330'x210' 30 fc 30' $84,416 $104, 141 $48, 606
<br /> 330'x210' 50 fc $ 119,039 $149 ,901 $75, 057
<br /> 330'x225' 30 fc 30' 1 $90,213 $108 ,491 $52, 635
<br /> 330'x225' 50 fc $ 125, 162 $156 ,046 $78, 601
<br /> 360'x160' 30 fc 30' $78, 619 $99,791 $44, 177
<br /> 360'x160' 50 fc $ 119,039 $149,901 $75, 057
<br /> 360'x180' 30 fc 30' $78, 619 $99, 791 $44, 177
<br /> 360'x180' 50 fc $ 119,039 $149,901 $75, 057
<br /> 360'x210' 30 fc 30' $90,213 $108 ,491 $52, 635
<br /> 360'x210' 50fc $ 125, 162 $156 ,046 $78,601
<br /> 360'x225' 30 fc 30' $95, 532 $ 1203109 1 $56, 370
<br /> 360'x225' 50 fc $ 133,039 $ 163 ,918 $87,058
<br /> 360'x240" 30 fc 30' $95, 532 $ 120 , 109 $56 ,370
<br /> 360'x240' 50 fc $139 ,414 $ 173 ,861 $91 ,288
<br /> Football - Standard pole locations are located at the 15 yard line, with setbacks from the field as given
<br /> below.
<br /> Light LSG 110 Exp B LSG 140 Exp C
<br /> Size Level Set-back Price Price SCG Price
<br /> No track 30 fc 60' $78,619 $99,791 $44 , 177
<br /> No track 50 fc $ 122 , 101 $156, 551 $763829
<br /> No track 100 fc $218,386 $242,641 $152 ,364
<br /> No track 30 fc 80' $90, 157 $108,435 $523607
<br /> No track 50 fc $ 140,280 $178, 508 $78 , 545
<br /> No track 100 fc $240,635 $281 , 107 $ 161 , 193
<br /> No track 30 fc 100' 1 $ 113,283 $148, 818 $54 ,448
<br /> No track 50 fc $ 151 , 111 $227,400 $85 ,235
<br /> No track 100 fc $271 ,577 $332 ,217 $ 176 , 177
<br /> No track 30 fc 120' $ 133,021 $204, 667 $63,040
<br /> No track 50 fc $ 190, 715 $254, 730 $98, 134
<br /> No track 100 fc $316,660 $364, 775 $ 196,565
<br /> Section II - Adders/Deducts
<br /> A. Purchase of additional lighting for security, special areas, or replacing lights on existing poles and
<br /> non-standard field sizes or pole locations . $ 2 .600 per fixture
<br /> B. Control and Monitoring Adder for SCG $6 ,500 per unit
<br /> C . Additional Control & Monitoring units necessary due to additional electrical services .
<br /> (Base price includes one unit per project) $3. 600 per unit
<br /> Jacksonville Spec 04-24r5.doc 3 Created on 12/1/2006 4:32 PM
<br />
|