Laserfiche WebLink
D . Osprey Nest Platforms $2 .500 each <br /> E. Adder for additional spill and glare control $2 .900 per pole <br /> F. Freight adder/deduct based off base bid of 1 , 190 miles $0. 11 per fixture/oer mile <br /> Section III — Labor Costs <br /> A. Pole Installation (price per pole) <br /> Pole 110 Exposure 140 Exposure <br /> Height B C <br /> 40' $2,420 $22640 <br /> 50' $2,640 $2 ,750 <br /> 60' $2,860 $3 ,630 <br /> 70' $39300 $37740 <br /> 80' $3,850 $5,060 <br /> 90' $4,730 $5,390 <br /> 100 ' $6, 160 $6, 820 <br /> 110 ' $10, 560 $11 ,220 <br /> B . Removal of Existing Poles or Structures $4,000 per pole <br /> C. Installation of Fixtures on Existing Poles $4. 500 per Dole <br /> Section IV — Electrical Costs <br /> A. Service Options <br /> Option A — 200 Amp Service (Section IV, A, 1 ) S 9 .600 each <br /> Option B — 400 Amp Service (Section IV, A, 1 ) $13 ,900 each <br /> Option C — 600 Amp Service(Section IV, A, 1 ) $ 19,500 each <br /> B. Conduit, Pull Boxes and Conductors <br /> 1 . Wiring from Panel to Contactors <br /> a. Connect wiring from one 3 pole, 30 amp breaker to <br /> one 3 pole, 30 amp contactor using 346 conductors, <br /> max distance of 10 feet 75 each <br /> b . Connect wiring from one 3 pole, 60 amp breaker to <br /> one 3 pole , 60 amp contactor using 3-44 conductors, <br /> max distance of 10 feet 85 each <br /> 2 . Wiring from Contactors to Poles <br /> a. 2 '/z' PVC with (4) 3/0 $ 29 per foot <br /> b. 4" PVC with (4 ) 500mcm $ 55 per foot <br /> c. (2) 4" PVC with (4) 300mcm $ 74 per foot <br /> Jacksonville Spec 04-24r5.doc 4 Created on 12/1 /2006 4:32 PM <br />