My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-085
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2016 2:02:07 PM
Creation date
9/30/2015 10:38:36 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d . 2" PVC with (4) #1 THW N conductors $ 22 per foot <br /> 3. Pull Boxes <br /> a. Brooks 38T pull box with 8" x 8" x 6" PVC box 400 each <br /> Inside <br /> b . Connect 441 conductors from pull box to sports <br /> lighting pole, maximum distance of 10 feet 95 each <br /> C . Lightning Protection <br /> 1 . Surge Arrestor — protection at remote electrical enclosure 900 each <br /> 2 . Surge Arrestor — protection online side of panel $ 7, 500 each <br /> Section V — Engineered Plans <br /> A. Electrical Engineering Drawings , sealed by P. E. <br /> 3. Adder for 200 amp service $ 5. 000 each <br /> 4 . Adder for 400 amp service $ 7, 500 each <br /> 5. Adder for 600 amp service $ 12 .000 each <br /> B . Structural Engineering Drawings, sealed by P . E . <br /> 1 . Foundation and pole plans based on assumed soils $1 ,000 per project <br /> 2 . Foundation and pole plans based on geotech report $2 .500 per project <br /> C. Geotech report $7,500 per project <br /> D. Bonding (over $200, 000 ) $ 1 ,550 per $ 100 ,000 <br /> E. Site survey $2 , 500 per Proiect <br /> F. Project management $5 ,000 per project <br /> Section VI - Yearly Adjustments <br /> A. During the term of this contract, technical upgrades to these products may periodically become <br /> available and will be offered to the owner. Musco reserves the right to supply upgraded technology <br /> provided it maintains the on-field lighting performance, enhances benefits and does not exceed the <br /> prices bid when applied to a project application under the current contract provisions . <br /> B . During the term of this contract if the state of Florida Building Codes/Wind speeds change , Musco <br /> reserves the right to adjust pricing accordingly. <br /> Jacksonville Spec 04-24r5.doc 5 Created on 12/1 /2005 4:32 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.