My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-120
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 10:48:38 AM
Creation date
9/30/2015 9:38:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/11/2006
Control Number
2006-120
Agenda Item Number
7.F.
Entity Name
P.J. Land Clearing & Excavating, Inc.
Subject
documents and specifications for Oslo Road Clearing
Area
8th. Ct SW - 27th. Ave SW
Bid Number
2006060
Supplemental fields
SmeadsoftID
5588
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 2 - MAINTENANCE OF TRAFFIC <br />Section 2A — Maintenance of Traffic <br />1. Contractor shall maintain traffic within the limits of the project for the duration of <br />the clearing operation in accordance with the U.S. Department of Transportation's <br />Manual on Uniform Traffic Control Devices (MUTCD) latest edition, FDOT Index <br />600 Series and FDOT Standard Specification Section 102. <br />2. Cost of Maintenance of Traffic shall be Lump Sum. <br />Section 2B — Protection of Public <br />1. Provide, erect and maintain barriers, lights and other devices as required to protect <br />general public, workers and adjoining property. <br />2. There shall be no separate payment for protection of public. The cost shall be <br />included in the Lump Sum Price for Maintenance of Traffic. <br />DIVISION 3 - SITE WORK <br />Section 3A — Clearing <br />1. Trim back trees and brush that extend in to area designated on plans to be cleared. <br />2. Clear trees and brush one inch in diameter or greater from designated clearing area, <br />except trees and brush designated in field to remain. <br />3. Cut to a minimum height of 2" above existing grade. <br />4. Backfill any holes or depressions resulting from clearing operations. <br />5. Completely remove and dispose of all cleared materials. <br />6. Cost of all work under this Section shall be included in the unit price for clearing. <br />Page 15 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.