Laserfiche WebLink
DIVISION 2 - MAINTENANCE OF TRAFFIC <br />Section 2A — Maintenance of Traffic <br />1. Contractor shall maintain traffic within the limits of the project for the duration of <br />the clearing operation in accordance with the U.S. Department of Transportation's <br />Manual on Uniform Traffic Control Devices (MUTCD) latest edition, FDOT Index <br />600 Series and FDOT Standard Specification Section 102. <br />2. Cost of Maintenance of Traffic shall be Lump Sum. <br />Section 2B — Protection of Public <br />1. Provide, erect and maintain barriers, lights and other devices as required to protect <br />general public, workers and adjoining property. <br />2. There shall be no separate payment for protection of public. The cost shall be <br />included in the Lump Sum Price for Maintenance of Traffic. <br />DIVISION 3 - SITE WORK <br />Section 3A — Clearing <br />1. Trim back trees and brush that extend in to area designated on plans to be cleared. <br />2. Clear trees and brush one inch in diameter or greater from designated clearing area, <br />except trees and brush designated in field to remain. <br />3. Cut to a minimum height of 2" above existing grade. <br />4. Backfill any holes or depressions resulting from clearing operations. <br />5. Completely remove and dispose of all cleared materials. <br />6. Cost of all work under this Section shall be included in the unit price for clearing. <br />Page 15 of 39 <br />